8th Floor, L&C Tower
Nashville, TN 37243
(615) 532-0445
SRF Contacts
Questions? Ask SRF
State Design Criteria
» Design Criteria for Sewage Works
» Design Criteria for Community Water Systems
Design Conferences
» Pre-design and Interim Design Conferences
Project Sign Details
» Links to Project Sign Detail Files
Design Document Reviews
» Clean Water Plans and Specifications and Addenda Review
» Drinking Water Plans and Specifications and Addenda Review
Disadvantaged Business Enterprise Solicitation Guidance
» Disadvantaged Business Enterprise (DBE) Solicitation and Participation
Advertisement for Bids Guidancee
» How to Advertise for Bids
» Documents for Download
A Pre-design Conference attended by the Loan recipient’s designee and the consulting engineer is held at the offices of the Loan recipient. At a minimum, the considerations for the SRF Loan Program loan, design, and general issues listed in the table below are discussed at the Pre-design Conference.
Interim Design Conferences attended by the consulting engineer and the engineering staff responsible for the design of the project are usually held at the consulting engineer´s office. Interim Design Conferences are generally held at the 30-percent and 80-percent design completion stages or on an as-needed basis. A 30-percent Interim Design Conference concentrates on basic design information including facility location, arrangement of structures, geotechnical investigation results, status of easement acquisitions, Inter-municipal Agreements, required ordinances and permits, and project scheduling. An 80-percent Interim Design Conference focuses on specific design features and the means and methods necessary to construct the planned facility.
Loan Considerations |
Design Considerations |
General Considerations |
| Project Funding | State Design Criteria | Easement Acquisitions |
| Design Team Contacts | Operating Permit Limitations | Construction and Environmental Permits |
| Project Scheduling | Sludge Disposal Site / Method (Clean Water Projects only) |
Inter-municipal Agreements |
| Interim Design Reviews | Stream Reliability Classification (Clean Water Projects only) |
|
| Plans/Specifications Submittal | Engineering Design Report | |
| Plans/Specifications Approval | Bonding and Insurance | |
| Special SRF Loan Conditions | MBE/WBE Solicitation | |
| Bid Proposals | ||
| Retainage | ||
| Procurement Regulations | ||
| Force Account Labor | ||
| Job Site Safety Responsibilities |