Design-Build Project - SR-40 Bridge

DB1802

The files presented here are FOR INFORMATION ONLY. TDOT makes no warranty of any kind, express or implied, with respect to the file(s) and specifically makes no warranty that said file(s) shall be fit for any particular purpose. Furthermore, any description of said file(s) shall not be deemed to create an express warranty that such file(s) shall conform to said description. Receiver assumes all risk and liability for any losses, damages, claims or expenses resulting from the use or possession of any file(s) furnished by TDOT.

 

US-64 (SR-40) Bridge Design-Build, Polk County

Contract Awards

Summary Of Bids (Bid Tabs)

Apparent Bid Results - 11/1/19

US-64 (SR-40) Bid File on Bid Express (Official Bid File) -10/10/19

US-64 (SR-40) Final RFP Contract Book 1, 2, and 3 (Addenda Included) - 10/10/19

US-64 (SR-40) Final Q/R (For Technical Proposal) - 10/10/19

US-64 (SR-40) RFP with Highlighted Addenda Incorporated

US-64 (SR-40) RFP - Released 4/12/19 

        Addendum #1 - 5/31/19 

        Addendum #2 - 6/27/19

        Addendum #3 - 7/25/19

        Addendum #4 - 9/9/19

        Addendum #5 - 9/16/19

        Addendum #6 - 9/25/19

        Book 1 Forms - 4/12/19

        Book 2 Forms - 4/12/19 

        Q/R #1 for RFP - 5/7/19

        Q/R #2 for RFP - 5/14/19

        Q/R #3 for RFP - 6/3/19 

        Q/R #4 for RFP - 6/17/19

        Q/R #5 for RFP - 6/27/19

        Q/R #6 for RFP - 7/30/19

        Q/R #7 for RFP - 9/21/19

SR-40 Short-listed Design Builder Firm/Design Consultant - 1/16/19

Reference Material - Updated 9/9/19