EC-STR-13
ROCK AND EARTH SEDIMENT EMBANKMENTRelated Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
EC-STR-1 | DEWATERING STRUCTURE | ROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A DEWATERING STRUCTURE. |
EC-STR-2 | SEDIMENT FILTER BAGS | ROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A SEDIMENT FILTER BAG. |
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
203-01 | C.Y. | ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) | |
209-05 | C.Y. | SEDIMENT REMOVAL | |
709-05.06 | TON | MACHINED RIP-RAP (CLASS A-1) | |
740-10.03 | S.Y. | GEOTEXTILE (TYPE III)(EROSION CONTROL) | |
801-01.07 | UNIT | TEMPORARY SEEDING (WITH MULCH) |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 04-15-2006 | 04-01-2008 | 08-01-2012 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: July 12, 2024 at 11:37 AM