EC-STR-27
TEMPORARY SLOPE DRAIN AND BERMRelated Standard Drawings
DRAWING | DESCRIPTION | REMARKS |
---|---|---|
Related Item Numbers
ITEM NO. | U/M | DESCRIPTION | REMARKS |
---|---|---|---|
203-01 | C.Y. | ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED) | |
209-02.03 | L.F. | 8" TEMPORARY SLOPE DRAIN | |
209-02.04 | L.F. | 10" TEMPORARY SLOPE DRAIN | |
209-02.05 | L.F. | 12" TEMPORARY SLOPE DRAIN | |
209-02.06 | L.F. | 15" TEMPORARY SLOPE DRAIN | |
209-02.07 | L.F. | 18" TEMPORARY SLOPE DRAIN | |
709-05.06 | TON | MACHINED RIP-RAP (CLASS A-1) |
Archived Standard Drawings
DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD ) |
---|
10-26-1992 | 12-18-1995 | 07-29-1997 | 05-27-2001 | 04-15-2006 | 04-01-2008 | 08-01-2012 |
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov
This Page Last Updated: June 12, 2020 at 12:29 PM