I-24
REGION 3 On-Call Guardrail:Thursday November 12 through Wednesday November 18, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Rutherford, Williamson, Cheatham, Sumner, Dickson, Montgomery, Marshall, and Giles Counties for guardrail repair and installation.
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24, both directions, between Old Hickory Blvd and Bell Rd (MM 40 to MM 61)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24, both directions, between the I-440 Interchange and Old Hickory Blvd (MM 52 and MM 62), 2-3 lanes remain open (multiple locations for foundation installation.)
THOMAS & ASSOCIATES: Thursday November 12 through Wednesday November 18, each day, 2PM, There will be rolling roadblocks on I-24 eastbound and westbound near Waldron Rd. (Exit 64) for blasting. Local police officers will be utilized for this operation.
COFFEE COUNTY, I-24 resurfacing project from Noah Fork Creek (LM 3.45/MM100) to US-41 (LM 8.77/MM105): (Recovery Act Project)The contractor will have lane closures from 7:00 PM to 6:00 AM the following morning to perform resurfacing activity. One lane will be maintained in both directions at all times. Estimated completion date is November 2009.
MARION COUNTY, I-24 resurfacing from US-72/SR-27/SR-150 (LM 17.61) at MM 152 to the Tennessee River (LM 25.84) at MM 161: (Recovery Act Project) The contractor will have lane closures between the hours of 7:00 PM to 6:00 AM the following morning to perform resurfacing activities. One lane will be maintained in both directions at all times. Estimated completion date is December 2009.
HAMILTON COUNTY, I-24 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. They will also implement the following lane closures:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24 W @ MM 182.3 & 182.4 – Right lane closure. Two lanes are to remain open.
o I-24 E @ MM 181.9 & 182.4 – Right lane closure. Two lanes are to remain open.
Estimated completion date is December 2010.
I-124
No construction activity to report at this time.
I-26
No construction activity to report at this time.
I-40
SHELBY COUNTY, Seismic Retrofit on the bridge on I-40 over the Mississippi River
Existing six lane cross-section (arch spans) weekday closure
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
Existing four lane cross-section (east of the arch spans) weekend closure
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
SHELBY COUNTY, REGION 4, Installation of Longitudinal Cable Barrier Rail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
SHELBY and FAYETTE COUNTIES, REGION 4, Relensing of Snowplowable Markers:Sunday, November 15 through Friday, November 20. I-40 westboundand eastbound MM 43.27 to MM 0.00 from 6PM-6AM, nightly. The contractor will have one lane maintained at all times.
FAYETTE-SHELBY COUNTIES, REGION 4, Installation of Longitudinal Cable Barrier Rail:Thursday, November 12 and Friday, November 13, @ Sam Cooper westboundon I-40 MM 27.00 to MM 25.00 from 8PM-6AM nightly. The contractor will have one lane maintained at all times.
MADISON COUNTY, REGION 4, Installation of Longitudinal Cable Barrier Rail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
HAYWOOD COUNTY, REGION 4, On-Call Guardrail Repair:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
MADISON COUNTY, REGION 4, On-Call Guardrail Repair:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
HAYWOOD and MADISON COUNTIES, REGION 4, Relensing of Snowplowable Markers: Thursday, November 12 and Friday, November 13. I-40 westboundand eastbound MM 95.11 to MM 43.27 from 6PM-6AM, nightly. The contractor will have one lane maintained at all times.
HENDERSON COUNTY, REGION 4, Installation of Longitudinal Cable Barrier Rail: Tuesday, November 17 and Wednesday, November 18, I-40 eastbound MM 100.00 to MM 101.00 from 8PM-6AM nightly. The contractor will have one lane maintained at all times.
HENDERSON COUNTY Design-Build on SR-104 over I-40 (MM 101):Saturday, November 14 and Sunday, November 15, I-40 eastbound and westbound from 6AM-6PM. The contractor will haveintermittent lane closures to set portable barrier rails in the median around the bridge on I-40. One lane will be maintained in both directions at all times. (THP will be assisting with traffic control).
BENTON COUNTY, REGION 4, Installation of Longitudinal Cable Barrier Rail:Sunday, November 15 through Tuesday, November 17. I-40 westbound MM 133.00 to MM 130.00 tofrom 8PM-6AM, nightly. The contractor will have one lane maintained at all times.
REGION 3 On-Call Guardrail:Thursday November 12 through Wednesday November 18, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Rutherford, Williamson, Cheatham, Sumner, Dickson, Montgomery, Marshall, and Giles Counties for guardrail repair and installation.
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, both directions, between US 70 and Old Hickory Blvd (MM 196 to MM 222)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, both directions, between the I-24 Interchange and Old Hickory Blvd (MM 213 to MM 222), 3 lanes remain open (multiple locations for foundation installation).
o I-40, Westbound, between US70S and east of Charlotte Pike (MM 196 to MM 203), 2 lanes remain open. (multiple locations for foundation installation).
o I-40, both directions, between Briley Pkwy and Spence Lane (MM 215 to 213)
· Friday 8pm to Monday 5am, one left lane closed in both directions for median foundation work.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, Resurfacing on I-40 from US 70S to Charlotte Pike:(Recovery Act Project) Thursday November 12 and Friday November 13, 8PM-5AM, There will be alternating lane closures on I-40 in both directions in order to place permanent striping on the roadway. One lane will remain open.
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project) Thursday November 12 through Wednesday November 18, 10AM and 1PM, each day, Rolling roadblocks for I-40 East bound and Westbound traffic for blasting operations on the north side of I-40 in the White Bridge Road area. Traffic will also be stopped on Robertson Rd., Urbandale Ave., and White Bridge Rd.
DAVIDSON COUNTY, Grading, drainage, and paving of the I-40 ramps @ 2nd & 4th Ave.:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
PUTNAM COUNTY, I-40 resurfacing project from MM 267.25 to MM 274: (Recovery Act Project) The contractor will have lane closures to perform stone and striping operations between 7:00 PM and 6:00 AM. One lane will be maintained in both directions at all times. Estimated project completion date is November 2009.
CUMBERLAND COUNTY, I-40 resurfacing from MM 306 to MM 311 (Plateau Road): Work on this project is complete and awaiting completion of punchlist items. Estimated completion date is November 2009.
COCKE COUNTY, I-40 East near the North Carolina State Line: I-40 East remains closed near the North Carolina state line due to a rockslide approximately three miles inside North Carolina. I-40 East is closed just east of the Waterville Exit (Exit 451). I-40 thru traffic should follow I-81 North (Exit 421) to I-26 East (Exit 57A) towards Asheville, however, all exits on I-40 in Tennessee are open and accessible. For updated information, go to http://www.tdot.state.tn.us/rockslide.htm
I-140
No construction activity to report at this time.
I-240
No construction activity to report at this time.
I-440
REGION 3 On-Call Guardrail:Thursday November 12 through Wednesday November 18, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Rutherford, Williamson, Cheatham, Sumner, Dickson, Montgomery, Marshall, and Giles Counties for guardrail repair and installation.
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-440, both directions, between Hillsboro Pike and I-24 (MM 3 to MM 7)
DAVIDSON COUNTY, I-440 Concrete Rehabilitation:(Recovery Act Project) Saturday November 14, 4AM through Sunday November 15, 6AM, I-440 westbound will be closed from I-24 to I-65 for concrete repairs.
I-640
KNOX COUNTY, I-640 West Flyover Ramp to I-40 East: The flyover ramp from I-640 West to I-40 East is reduced from two lanes to one around the clock as crews perform bridge repairs. Motorist should be alert for workers present and use extreme caution in this area. The estimated completion date for this project is November 15, 2009.
I-55
SHELBY COUNTY, I-55 Resurfacing at Mississippi state line to Nonconnah Creek:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
SHELBY COUNTY, REGION 4, On-Call Guardrail Repair:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
SHELBY COUNTY, I-55 at Mallory Avenue: Widening of exist bridges, 3 lanes reduced to 2 each direction. Southbound will be shifted to the newly widening roadway. Traffic switched to new roadway. There will no longer be access to Mallory (Exit 9) from Northbound I-55. Use Third St (Exit 7) detour to Mallory. Riverside Drive from Mallory Avenue to Devant Street is closed indefinitely. This existing section of roadway will be new location of the northbound I-55 entrance ramp. Use the newly constructed Riverport Road extension as an alternate route.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-155
DYER COUNTY, I-155 Bridge Repair: bridge repairs, over Mississippi River. Northbound and Southbound shoulders are closed. Thursday, November 12 7AM through Wednesday, November 18 7AM (24 hours), westbound and eastbound. The contractorwill have lane closures in order to re-paint the steel structure and perform concrete repairs. One lane will be maintained in both directions at all times. Once the contractor starts he has to keep going till he is finished.
I-65
REGION 3 On-Call Guardrail:Thursday November 12 through Wednesday November 18, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Maury, Rutherford, Williamson, Cheatham, Sumner, Dickson, Montgomery, Marshall, and Giles Counties for guardrail repair and installation.
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-65, both directions, between Concord Rd and Long Hollow Pkwy (MM 70 to MM 97)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-65, both directions, between Concord Rd and the I-440 Interchange (MM 71 to MM 80), 2-3 lanes remain open (multiple locations for foundation installation).
SUMNER COUNTY, TDOT Maintenance:Thursday November 12, 7PM-5AM, The left lane of I-65 northbound in Sumner County at MM 97.0 will be closed for grinding and paving. One lane will remain open.
I-75
HAMILTON and BRADLEY COUNTIES, I-75 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. They will also implement the following lane closures: Estimated completion date is December 2010.
HAMILTON COUNTY, I-75 widening project from 1.1 miles south of Lee Highway (SR-2, US-11) to 1.2 miles north of Lee Highway (SR-2, SR-11): The contractor will only need a lane closure on I-75 during this period if there is an emergency situation which requires maintenance of items. If a lane closure is required, one lane of traffic will remain open at all times.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
Estimated completion date is December 2010.
I-275
No construction activity to report at this time.
I-81
GREENE COUNTY, I-81 North at Exit 23 (US 11E/SR 34):Beginning at 10 p.m. Saturday night, November 14, 2009 through approximately 10 a.m. Sunday, November 15, 2009, I-81 Northbound traffic will be diverted off of I-81 North at Exit 23, across US 11E and back onto the interstate at the entrance ramp as crews perform repairs to bridge beams. Motorists should be alert for uniformed officers directing traffic through the intersections of the I-81 ramps and US 11E. Motorists should be alert for a lane closure approaching Mile Marker 23 on I-81 North and be alert for slowed and/or stopped traffic. Motorists should expect potential long delays through this area during this time. Motorists on US 11E approaching the I-81 interchange should be alert for officers directing traffic and expect major delays. Motorists on US 11E should consider alternate routes during this time.
Sullivan County, I-81 between South of Exit 63 and North of Exit 69 (Resurfacing): The contractor is continuing this resurfacing project. This work will cause temporary lane closures at night between 7:00 pm and 6:00 am Sunday through Friday. Motorist will also encounter narrowed ramps at Exit 63, 66 and 69 as the contractor works on repairing these ramps. Motorists are asked to use caution in this area.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Most work is weather dependent and subject to change due to inclement weather.