Middle Tennessee Construction August 27 through September 2, 2009

Thursday, August 27, 2009 | 07:22am
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project)
      Thursday August 27 through Wednesday September 2, 10AM-10:15 AM and (also) 1PM-1:15PM, Rolling roadblock for I-40 East bound and Westbound traffic for blasting operations on the south side of I-40 in the White Bridge Road area. 
 
DAVIDSON COUNTY, Resurfacing on I-40 from Charlotte Pike to Westboro Dr:(Recovery Act Project)
      Thursday August 27, Friday August 28, and Monday August 31 through Wednesday September 2, 8PM-5AM, There will be alternating lane closures on I-40 in order to install guardrail.
 
DAVIDSON COUNTY, Resurfacing on I-40 from US 70S to Charlotte Pike:(Recovery Act Project)
      Thursday August 27, Friday August 28, and Monday August 31 through Wednesday September 2, 8PM-5AM, There will be alternating lane closures on I-40 in order to install guardrail.
 
DAVIDSON COUNTY, Concrete Pavement Repair on I-440:(Recovery Act Project)
      Friday August 28, 8PM through Monday August 31, 6AM, I-440 eastbound will be closed from I-40 to I-65 for concrete pavement rehabilitation.
      Thursday August 27 through Wednesday September 2, 8PM - 6AM, each night, There will be alternating lane closures on I-440 in both directions in order to remove permanent striping and repaint lines. One lane will remain open in each direction.
 
REGION 3 On-Call Guardrail:
      Thursday August 27 through Wednesday September 2, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Rutherford, Maury, Hickman, Humphreys, Dickson, and Marshall Counties for guardrail repair and installation.
      Thursday August 27 through Wednesday September 2, 9AM-4PM, There will be various shoulder closures in Middle Tennessee on state routes for guardrail repair and installation.
 
DAVIDSON COUNTY, Hillsboro Road drainage, grading, resurfacing, retaining walls:(Recovery Act Project)
      Sunday August 30 through Thursday September 3, 9PM-6AM each night (including weekends), There will be lane closures on Hillsboro Rd. in order to pave the roadway. One lane will remain open in each direction.
 
DAVIDSON COUNTY, Resurfacing on SR 12 (Rosa Parks) from I-65 to SR 112: (Recovery Act Project)
      Thursday August 27 through Wednesday September 2, 8PM-6AM, (excluding weekends), There will be alternating lane closures on Rosa Parks Blvd. in order to raise utility boxes and pave the roadway. One lane will remain open in each direction.
 
REGION 3, Installation of Cable Barrier:
      Monday August 31 through Thursday September 3, 8PM-6AM, each night, There will be alternating lane closures on SR 840 westbound and eastbound in Rutherford County from MM 57 to MM 61 in order to install cable barrier. One lane will remain open.
 
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
      Thursday August 27 through Wednesday September 2, 9AM-3PM and 7PM-6AM. There will be periodic day and night time shoulder closures at various locations within the areas listed below in order to install devices, perform electrical work, and pole installation.
o   Briley Parkway, both directions between I-40 and Centennial Blvd (MM 6 to MM 27)
o   I-24, both directions between Old Hickory Blvd and Bell Road (MM 40 to MM 61)
o   I-40, both directions between US-70 and Old Hickory Blvd (MM 196 to MM 222)
o   I-65, both directions between Concord Rd and Long Hollow Pike (MM 70 to MM 97)
o   I-440, both directions between Hillsboro Pike and I-24 (MM 3 to MM 7)
o   Ellington Parkway, both directions between Briley Pkwy and Spring Street
      Thursday August 27 through Wednesday September 2, 8PM-5AM, There will be periodic short term night time lane closures at the following locations to install device foundations, DMS foundation installation, and shoulder paving.
o   Briley Pkwy, both directions, between Elm Hill Pike and Brick Church Pike, (MM 7 to MM 27), 3 lanes remain open (multiple locations for structures and shoulder work).
o   Briley Pkwy, southbound, between Two Rivers Pkwy and Lebanon Pike (MM 8 to MM 9)
    • Wednesday and Thursday, 8pm-5am, double left lane closure plus traffic pacing, will close second lane at 10pm then begin pacing to ferry barrier rail.
    • Friday 8pm to Monday at 5am, one right lane closed, 3 lanes remain open.
    • I-40, both directions, between the I-24 Interchange and Old Hickory Blvd (MM 213 to MM 222), 3 lanes remain open (multiple locations for foundation installation).
    • I-40, Westbound, between Memphis Bristol (US70) and east of Charlotte Pike (MM 196 to MM 203), 2 lanes remain open. (multiple locations for foundation installation)
 
REGION 3, Retracing of Painted Markings on Interstate and State Routes:
      Thursday August 27 through Thursday September 3, 8AM-5PM each night,There will be various rolling closures in Perry, Humphreys, Hickman, Houston, Marshall, Moore, and Dickson Counties on State Routes in order to retrace pavement marking.
 
REGION 3, Relensing of Snowplowable Markers on various Interstate and State Routes:
      Thursday August 27, Sunday August 30 through Wednesday September 2, 8PM-6AM, There will be mobile lane closures in Davidson County on I-24 (MM 40-64) and on I-40 (MM 204-223) in order to replace snowplowable markers. One to two lanes will remain open at all times.
      Friday August 28 and Saturday August 29, 8PM-6AM, There will be mobile lane closures in Williamson County on SR 840 (MM 6-7 and MM 28-46) and in Rutherford County on SR 840 (MM 46-65) in order to replace snowplowable markers. One to two lanes will remain open at all times.
 
WILLIAMSON COUNTY, Concord Rd. from Sunset Rd. to Edmondson Pike
      Thursday August 27 through Wednesday September 2, 9AM-3PM, (excluding weekends), There will be alternating lane closures from Crockett Rd. to Sunset Rd. in order to clear the right of way. Flaggers will be utilized for this operation.
 
SMITH COUNTY, Resurfacing on I-40 from SR 53 to the Putnam Co. line (Recovery Act Project)
      Thursday August 27, 7PM-6AM, One lane of I-40 Westbound will be closed for traffic counter loop installation work near mile marker 267. One lane will remain open.
      Friday August 28, 7PM through Monday August 31,6AM, One lane in each direction of I-40 will be closed for bridge deck repair work near mile marker 261 Eastbound and mile marker 263 Eastbound and Westbound. One lane in each direction will remain open.
 
 
 
WILSON COUNTY - S.R. 109 from I-40 to S.R. 24 
      Thursday August 28 and Tuesday September 1, 12 Noon-1PM, There will be lane interruptions for blasting both directions of SR 109 at Hickory Ridge Road. Traffic will be stopped for the blast, and maybe delayed up to 15 minutes to remove debris, if necessary.
 
WILSON COUNTY - SR 26 beginning at Maddox-Simpson Parkway and ending at Taylor Road:(Recovery Act Project)
      Thursday August 27 through Wednesday September 2, 8AM-4PM (excluding weekends), There will be lane closures in each direction for milling and paving. Traffic will be flagged.
 
DAVIDSON COUNTY, TDOT Maintenance:
Davidson County
      Thursday August 27 through Wednesday September 2, 9AM-3PM, There will be possible lane closures at various locations in Davidson County in order to patch potholes on an as needed basis.
      Thursday August 27 through Wednesday September 2, 9AM-3PM, There will be mobile operations in various locations in Davidson County for vegetation control. This will affect the shoulders or outside lanes.
      Thursday August 27 through Wednesday September 2, 7PM-5AM, There will be various lane closures on I-65 both directions between Dickerson Road and Trinity Lane to repair areas of the roadway.
      Thursday August 27 through Wednesday September 2, 9AM-3PM, Shoulder closures and possible lane closures on State Route 155 (Briley Pkwy.) both directions between State Route 12 (exit 24) and I-24 (exit 18) to clean under guardrail for drainage. One lane will remain open.
      Thursday August 27 through Wednesday September 2 (excluding weekends), 9AM-3PM, There will be possible lane closures on I-440 westbound at Belmont Blvd. inside and outside shoulder closures for drainage work.
      Thursday August 27 through Wednesday September 2 (excluding weekends), 8PM-12AM, There will be possible lane closures on I-440 westbound at Belmont Blvd. inside and outside shoulder closures for drainage work.
 
TDOT Maintenance-Special Event
Wilson County
      Friday August 28 and Saturday August 29, 7PM-1AM, I-40 westbound at EXIT 239: SR-26 / US-70 / LEBANON-WATERTOWN will have one lane closed. One lane will remain open. (Wilson County Fair)
 
Cheatham and Robertson Counties
      Thursday August 27 through Wednesday September 2, 8AM-4PM, There will be one lane periodically closed on I-24 eastbound and westbound in Cheatham and Robertson Counties between mile marker 24 and mile marker 32 in order to trim vegetation overhanging the roadway.  One lane will remain open. (Weather permitting)
Cheatham County
      Thursday August 27 through Wednesday September 2, 9AM-3PM, There will be one lane closed on I-40 eastbound and westbound in Cheatham County from the 189MM to 192MM, lane closure for repairing pot holes in bridge deck. One lane will remain open at all times.
 
THOMAS & ASSOCIATES: Thursday August 27 through Wednesday September 2, each day, 2PM, There will be rolling roadblocks on I-24 eastbound and westbound near Waldron Rd. (Exit 64) for blasting. Local police officers will be utilized for this operation.
 
DAVIDSON COUNTY, TDOT Utilities:  
      Thursday August 27 and Friday August 28, 9AM-3PM, On SR-254, Old Hickory Blvd. approximately 650' West of Eulala Drive, Davidson Co.  The request by R.J. York Homes is to dig up and remove sidewalk for a 16" water line for a 8" water tap.
      Sunday August 30, 6AM to 9AM, At the Briley Pkwy. and McGavock Pike interchange, Davidson Co.  The request by N.E.S is to place a new fiber optic cable over the roadway.  Two rolling stop blocks are expected.
      Sunday August 30, 6AM to 8PM, from Briley Pkwy. and McGavock Pike interchange to Briley Pkwy. and Two Rivers interchange.  This request by N.E.S. is for using the shoulder of the roadway for placing aerial fiber optic cable on existing poles running parallel on Briley Pkwy.  No Lane closures will be needed.
      Thursday August 27, 7PM-5AM, There will be lane closures on Nolensville Rd. in the Elysian Fields area in order for Metro Water to repair a water line.
 
 
 
 
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.
For real-time updates on all TDOT projects please visit our website at www.tennessee.gov/tdot and click on the SmartWay logo. For the latest traffic or weather conditions please call 5-1-1.

Follow us on Twitter at www.twitter.com/TN511 for statewide incident information or www.twitter.com/Nashville511 for incident information in Middle Tennessee.

Press Releases | Road Closures