Interstate Construction Report for January 21 - 27, 2010
Thursday, January 21, 2010 | 10:02am
I-24
REGION 3 On-Call Guardrail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24, both directions, between Old Hickory Blvd and Bell Rd (MM 40 to MM 61)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24, both directions, between the I-440 Interchange and Old Hickory Blvd (MM 52 to MM 62), 2-3 lanes remain open (multiple locations for foundation installation.)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
MARION and HAMILTON COUNTIES, I-24 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. Estimated completion date is December 2010.
I-124
No construction activity to report at this time.
I-26
No construction activity to report at this time.
I-40
SHELBY COUNTY, Seismic Retrofit on the bridge on I-40 over the Mississippi River
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image002.gif)
o Wednesday, January 20, 12AM until Friday, January 22, 7PM: There will be one Westbound lane closed, (two lanes open), one lane closed Eastbound (twolanes open).
o Friday, January 22, 7PM until Monday January 25, 6AM: There will be one lane closed Westbound (two lanes open), two lanes closed Eastbound (one lane open).
o Monday, January 25, 6AM through Wednesday, January 27: There will be one lane closed Westbound (two lanes open), one lane closed Eastbound (two lanes open).
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image002.gif)
o Wednesday, January 20, 12AM until Friday, January 22, 7PM: There will be two Westbound, two Eastbound lanes open.
o Friday, January 22, 7PM until Monday, January 25, 6AM: There will be two Westbound lanes open, onelaneclosed Eastbound (one lane open).
o Monday, January 25, 6AM through Wednesday, January 27: There will be two Westbound, two Eastbound lanes open.
NOTE: The eastbound exit ramp (Ramp N-O) located just east of the arch spans will be closed from 7PM Friday, January 22, until 6AM Monday, January 25. The westbound entrance ramp (Ramp IL/D) located just east of arch spans will remain open at all times. Delays due to weather may cause lane closures to be canceled or rescheduled.
SHELBY COUNTY, ITS Cable/Radar/Electrical Installation I-40 & I-240:Thursday, January 21, through Wednesday, January 27. No scheduled closures.
REGION 4, Installation of Longitudinal Cable Barrier Rail on various Interstate & State Routes:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image002.gif)
o Thursday, January 21, through Wednesday, January 27. I-40 westbound MM 25.00 to MM 18.00 from 8PM-6AM, nightly. The contractor will have one lane maintained at all times.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image002.gif)
o Thursday, January 21, through Tuesday, January 26. I-40 eastbound andwestbound MM 43.00 to MM 51.00 from 8PM-6AM, nightly. The contractor will have one lane maintained at all times.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image002.gif)
o Thursday, January 21, through Tuesday, January 26. I-40 eastbound andwestbound MM 113.00 to MM 84.00 from 8PM-6AM, nightly. The contractor will have one lane maintained at all times.
HENDERSON COUNTY Design-Build on SR-104 over I-40 MM 101.00:Saturday, January 23, I-40 eastbound from 7AM-12PM. The contractor will havelane closures in order to relocate equipment over I-40. One lane will be maintained in both directions at all times. (THP will be assisting with traffic control).
REGION 3 On-Call Guardrail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, both directions, between US 70 and Old Hickory Blvd (MM 196 to MM 222)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, both directions, between the I-24 Interchange and Old Hickory Blvd (MM 213 to MM 222), 3 lanes remain open (multiple locations for foundation installation).
o I-40, Westbound, between US70S and east of Charlotte Pike (MM 196 to MM 203), 2 lanes remain open. (multiple locations for foundation installation).
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, both directions, between Briley Pkwy and Spence Lane, DMS 38 and DMS 39 (MM 213-214)
o I-40, Westbound, at the Wilson County Line, DMS 42 (MM 223)
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project) Saturday January 23 and Sunday January 24, 6AM-6PM, and Monday January 25, 8PM-5AM, The I-40 eastbound off ramp at White Bridge Rd. (exit 204) will be closed in order to install bridge beams.
REGION 3 Installation of Cable Barrier:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
PUTNAM COUNTY, I-40 rockfall mitigation at various locations: The contractor will have daytime shoulder closures in order to place signs on project. Nighttime lane closures will be needed to place mix and set barrier rail to route traffic around construction activities. One lane will be maintained in both directions at all times. All lane closures will be from 7:00 PM to 6:00 AM. Estimated completion date is July 2010.
ROANE COUNTY, I-40 Westbound near Mile Markers 352.8 and 362.4: On Tuesday, January 26, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
LOUDON COUNTY, I-40 Westbound near Mile Marker 364.1: On Tuesday night, January 26, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
COCKE COUNTY, I-40 East between Mile Markers 443 and 449.5:Motorists should be alert for possible lane closures in this area during daylight hours as crews perform cable barrier installation. Motorists should be alert for workers present and use extreme caution through this area.
COCKE COUNTY, I-40 East near the North Carolina State Line: I-40 East remains closed near the North Carolina state line due to a rockslide approximately three miles inside North Carolina. I-40 East is closed just east of the Waterville Exit (Exit 451). I-40 thru traffic should follow I-81 North (Exit 421) to I-26 East (Exit 57A) towards Asheville, however, all exits on I-40 in Tennessee are open and accessible. For updated information, go to: http://www.tdot.state.tn.us/rockslide.htm
I-140
No construction activity to report at this time.
I-240
SHELBY COUNTY, ITS Cable/Radar/Electrical Installation I-40 & I-240:Thursday, January 21, through Wednesday, January 27. No scheduled closures.
I-440
REGION 3 On-Call Guardrail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-440, both directions, between Hillsboro Pike and I-24 (MM 3 to MM 7)
DAVIDSON COUNTY, I-440 Concrete Rehabilitation:(Recovery Act Project)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-640
KNOX COUNTY, I-640 Eastbound at Mile Marker 3.4 near the I-75/I-275 Interchange:On Tuesday night, January 26, 2010 between the hours of 8 p.m. and 6 a.m., motorists should be alert for a right lane closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
I-55
SHELBY COUNTY, I-55 at Mallory Avenue: Widening of exist bridges, 3 lanes reduced to 2 each direction. Southbound will be shifted to the newly widening roadway. Traffic switched to new roadway. There will no longer be access to Mallory (Exit 9) from Northbound I-55. Use Third St (Exit 7) detour to Mallory. Riverside Drive from Mallory Avenue to Devant Street is closed indefinitely. This existing section of roadway will be new location of the northbound I-55 entrance ramp. Use the newly constructed Riverport Road extension as an alternate route.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-155
DYER COUNTY, I-155 Bridge Repair: bridge repairs, over Mississippi River. Northbound and Southbound shoulders are closed. Thursday, January 21, through Wednesday, January 27. No scheduled closures.
I-65
REGION 3 On-Call Guardrail:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, TDOT Maintenance:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-65, both directions, between Concord Rd and Long Hollow Pkwy (MM 70 to MM 97)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-65, both directions, between Concord Rd and the I-440 Interchange (MM 71 to MM 80), 2-3 lanes remain open (multiple locations for foundation installation).
o I-65, both directions, between I-440 and Armory Drive (MM 79)
· Friday at 8pm to Monday at 6am, one left lane closed in both directions to install median foundation.
I-75
HAMILTON and BRADLEY COUNTIES, I-75 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. Estimated completion date is December 2010.
HAMILTON COUNTY, I-75 widening project from 1.1 miles south of Lee Highway (SR-2, US-11) to 1.2 miles north of Lee Highway (SR-2, SR-11): The contractor will only need a lane closure on I-75 during this period if there is an emergency situation which requires maintenance of items. If a lane closure is required, one lane of traffic will remain open at all times.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
Estimated completion date is December 2010.
LOUDON COUNTY, I-75 Northbound near Mile Marker 74.3: On Tuesday night, January 26, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
CAMPBELL COUNTY, I-75 Northbound at Mile Marker 130.3 and I-75 Southbound near Mile Markers (137.7) (138.3) (140.5) and (150.5):On Monday night, January 25, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
I-275
No construction activity to report at this time.
I-81
JEFFERSON COUNTY, I-81 Northbound near Mile Markers 0.4 and 1.1: On Sunday night, January 24, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
GREENE COUNTY, I-81 Southbound near Mile Marker 22.5: On Sunday night, January 24, 2010, between the hours of 8 p.m. and 6 a.m., motorists should be alert for a closure as crews perform guardrail repair. Motorists should be alert for workers present and use extreme caution traveling through this area.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Most work is weather dependent and subject to change due to inclement weather.