Middle Tennessee Construction December 30, 2010 – January 5, 2011

Thursday, December 30, 2010 | 06:50am
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project)
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
DAVIDSON COUNTY, I-65 at the junction with SR 12 (Rosa Parks Blvd.)
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
  • Monday January 3 through Wednesday January 5, 9AM-3PM and 7PM-6AM, There will be periodic day and night time shoulder closures at various locations within the areas listed below in order to install devices, electrical service, and testing. 
·         I-24, both directions, between Briley Pkwy and north of Old Hickory Blvd (MM 43 to MM 39) and between Hickory Hollow Pkwy and Waldron Rd (MM 60 to MM 64)
·         Vietnam Veterans, both directions, between I-65 and New Shackle Island (MM 0 to MM 5)
 
DAVIDSON COUNTY, Central Pike from US 70 to Stoners Creek
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
REGION 3 On-Call Guardrail:
  • Monday January 3 through Wednesday January 5, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Rutherford, Smith, and Wilson Counties for guardrail repair and installation.
 
REGION 3, On-Call Cable Barrier Repair
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
REGION 3, Retracing of Pavement Markings on Interstate and State Routes
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
REGION 3, On-Call Concrete Repair
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
REGION 3, On-Call Attenuator Repair
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
MONTGOMERY COUNTY, Bridge Construction on SR 13 (Wilma Rudolph) over the Red River
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
RUTHERFORD COUNTY, Widening on Waldron Rd (Recovery Act Project)
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
RUTHERFORD COUNTY, Bridge Repair on SR 840 over Overall Creek
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
 
SUMNER COUNTY, SR 109 Widening from SR 76 To SR 52
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
WILLIAMSON COUNTY, Widening of I-65 from SR 248 (Goose Creek) to SR 96
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
WILLIAMSON COUNTY, Slide Repair on SR 96 near Natchez Trace Pkwy.
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
WILSON COUNTY, SR-171 (Mt Juliet Road) Widening: (Recovery Act Project)
  • Monday, January 3 through Wednesday, January 5, 9AM – 3PM, There will be temporary lane closures on Mt. Juliet Road (SR-171) northbound and southbound, from Division Street to Lebanon Road, for excavation and installation of storm sewer.        
 
WILSON COUNTY, SR 109 widening from I-40 to SR 24
  • Thursday December 30 through Wednesday January 5: No closures scheduled.
 
DAVIDSON COUNTY, TDOT Maintenance:
Davidson County
  • Tuesday, January 4, and Wednesday, January 5; 9AM-3PM, There will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis.
  • Tuesday, January 4, and Wednesday, January 5; 9AM-3PM, There will be mobile operations in various locations in Davidson County for ditch cleaning. (Weather permitting)
  • Tuesday, January 4, and Wednesday, January 5; 9AM-3PM, and 7PM-1AM, There will be mobile operations in various locations in Davidson County for vegetation control. This will affect the shoulders or inside and outside lanes. (Weather permitting)
Robertson County 
  • Tuesday, January 4, and Wednesday, January 5; 9AM-4PM, There will be one lane closed periodically on I-24 in both directions in Robertson County between mile marker 25 and mile marker 19 in order to trim vegetation overhanging the roadway. One lane will remain open. This is between exit 24 (Springfield and Ashland City) and exit 19 (Adams). (Weather permitting)
Montgomery County 
  • Tuesday, January 4, and Wednesday, January 5; 9AM-4PM, There will be one lane closed periodically on I-24 westbound in Montgomery County between mile marker 8 and mile marker 11 in order to trim vegetation overhanging the roadway. One lane will remain open. Exit 11 is S.R. 76 Adams and Clarksville Exit, and Exit 8 is S.R. 237 Rossview Road Exit. (Weather permitting)
 
 
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather.

For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.

Press Releases | Road Closures