Interstate Construction Report for April 29 - May 5, 2010
Thursday, April 29, 2010 | 09:51am
I-24
TDOT Maintenance:
Davidson County
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24 eastbound from mile marker 53 to mile marker 63
Cheatham, Montgomery and Robertson Counties
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
REGION 3 On-Call Guardrail: Thursday April 29 through Tuesday May 4, 8PM-6AM, (each night), There will be one lane closures at various locations on interstate routes in Davidson, Rutherford, and Robertson Counties for guardrail repair and installation.
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-24 Eastbound, MM 55, between Briley Pkwy and Harding Place (MM 54 to MM 56), three lanes remain open.
o I-24 Westbound, MM 60.5, between Old Hickory Blvd and Hickory Hollow Pkwy (MM 62 to MM 60), three lanes remain open.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o DMS 34, MM 55, I-24 Eastbound, between Briley Pkwy and Harding Place (MM 54 to MM 56)
o DMS 36, MM 60.5, I-24 Westbound, between Old Hickory Blvd and Hickory Hollow Pkwy (MM 62 to MM 60)
HAMILTON, BRADLEY, and MARION COUNTIES, I-75 / I-24 / SR-153 / SR-29 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. On weekdays during non-peak hours, the contractor will have a right lane closure on SR-29 South at MM 2.5. Three lanes are to remain open with third available lane used as acceleration lane for on-ramp from Manufacturers Road. There also may be weeknight lane closures throughout the project between the hours of 10:00 PM and 5:00 AM, nighttime weekend lane closures between the hours of 10:00 PM and 10:00 AM, and intermittent temporary stoppages of traffic (less than 15 minutes) at various locations throughout the project area to allow the contractor to perform ITS work. THP will assist with traffic control. Estimated completion date is December 2010.
I-124
No construction activity to report at this time.
I-26
SULLIVAN & WASHINGTON COUNTY, I-26 East and West at various locations between Mile Markers 8 and 20:On Thursday, April 28, 2010 through Wednesday, May 5, 2010, motorists should be alert for possible lane closures through this area as crews install median cable barrier. Motorists should be alert for workers present and use extreme caution traveling through this area.
CARTER & UNICOI COUNTY, I-26 East and West at various locations between Mile Markers 20 and 44: On Friday, April 30, 2010, motorists should be alert for possible lane closures through this area as crews install median cable barrier. Motorists should be alert for workers present and use extreme caution traveling through this area.
I-40
SHELBY COUNTY, Seismic Retrofit on the bridge on I-40 over the Mississippi River: Various closures for existing six lane cross-section (arch spans):
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
Various closures for existing four lane section (east of the arch spans):
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
REGION IV Maintenance: Wednesday April 28 through Wednesday May 05, 8AM-4:00PM, There will be possible lane closures at various locations in Region IV in order to patch potholes on an as needed basis.
REGION IV On-Call Guardrail
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, Shelby County, westbound (MM 27.5 to MM 26.8), 1 lane to remain open.
o I-40, Shelby County, westbound (MM 20.0 to MM 19.5), 1 lane to remain open.
o I-40, Shelby County, eastbound (MM 4.3 to MM 6.6), 2 lanes to remain open.
REGION IV, Installation of Longitudinal Cable Barrier Rail on the Interstate (MM 133 to MM 43
HAYWOOD and HENDERSON COUNTIES
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40, Haywood County, both directions (MM 60 to MM 42), 1 lane to remain open.
o I-40, Henderson County, both directions (MM 101), 1 lane to remain open.
HENDERSON COUNTY Design-Build on SR-104 over I-40 MM 101.00: LOOK AHEAD: Saturday May 8 & Sunday May 9, 6AM-6PM: There will be one lane closures on I-40 eastbound & westbound to divert traffic onto the ramps over S.R. 104 & back to I-40. This lane closure is required for Phase 2 demolition of the old existing SR-104 bridge over I-40. S.R. 104 & the bridge located @ MM 101 will be closed to local traffic entering I-40. Traffic will be flagged on S.R. 104. THP will assist with lane closures on I-40.
DECATUR COUNTY-Resurfacing on I-40 at the CARROLL CO. line LM-0.00 to the BENTON CO. line LM-5.67
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
TDOT Maintenance:
Davidson County
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
Dickson County, Hickman, & Humphreys Counties
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
REGION 3 On-Call Guardrail: Thursday April 29 through Tuesday May 4, 8PM-6AM, (each night), There will be one lane closures at various locations on interstate routes in Davidson, Rutherford, and Robertson Counties for guardrail repair and installation.
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-40 both directions, MM 214, between I-24 and Briley Pkwy (MM 213 to MM 215), one left lane closed, 4 to remain open.
o I-40 both directions, MM 215.5. between Briley Pkwy and Donnelson Pike (MM 215 to MM 216), one left or one right lane closed, 4 to remain open.
DAVIDSON COUNTY, I-40 and Robertson Road Interchange:(Recovery Act Project) Thursday April 29 through Wednesday May 5, 10AM-10:15 AM and 1PM to 1:15 PM, (excluding weekends), There will be rolling roadblocks for both eastbound and westbound I-40 for blasting on the north side of I-40.
TDOT Utilities:Sunday May 2, 6AM-3PM, On I-40 & I-65, 300' south of Jo Johnson Ave. near MM 209 in Davidson County. This request by Nashville Electric Service for transferring transmission lines and pulling conductors strands over interstate system. Four rolling stop blocks are expected. Six police cars will be present.
DAVIDSON COUNTY, I-40 at EXIT 210C: Thursday April 29 through Wednesday May 5: No scheduled closures. Grading, drainage, and paving of the I-40 ramps @ 2nd & 4th Ave.
DAVIDSON COUNTY, Bridge Repair on New Hope Rd. over I-40:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
PUTNAM COUNTY, I-40 rockfall mitigation at various locations: The contractor will have a right shoulder closure in order to work on the project. Nighttime lane closures will be needed to set barrier rail to route traffic around construction activities. One lane will be maintained in both directions at all times. Each lane has been narrowed to a 10 foot width. The possibility exists daily for a potential rolling road block due to rock blasting activities. Emergency lane closures on an as needed basis will be implemented during daylight hours to accommodate pothole repair. All other lane closures will be from 7:00 PM to 6:00 AM. Estimated completion date is July 2010.
ROANE COUNTY, I-40 East between Mile Markers 356 and 364: On Thursday night, April 28, 2010 through Wednesday night, May 5, 2010 between the hours of 8 p.m. and 6 a.m., motorists should be alert for possible lane closures through this area as crews install median cable barrier. Motorists should be alert for workers present and use extreme caution through this area.
KNOX COUNTY, I-40 East and West between Rutledge Pike (Exit 392) and the Holston River Bridge (MM 395):Motorists should be alert for lane closures in both directions on Sunday nights through Thursday nights between the hours of 7 p.m. and 6 a.m. as crews resurface the roadway in this area. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.
I-140
No construction activity to report at this time.
I-240
REGION IV On-Call Guardrail
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-240, Shelby County, westbound 2 “Off” ramp lanes @ (Exit 20/Getwell Road), 1 ramp lane to remain open.
o I-240, Shelby County, westbound (MM 21.5 to MM 22.2), 2 lanes to remain open.
o I-240, Shelby County, northbound (MM 25.6 to MM 27.0), 2 lanes to remain open.
I-440
TDOT Maintenance:
Davidson County
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
REGION 3 On-Call Guardrail: Thursday April 29 through Tuesday May 4, 8PM-6AM, (each night), There will be one lane closures at various locations on interstate routes in Davidson, Rutherford, and Robertson Counties for guardrail repair and installation.
DAVIDSON COUNTY, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
DAVIDSON COUNTY, I-440 Concrete Rehabilitation:(Recovery Act Project)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-640
No construction activity to report at this time.
I-55
REGION IV Maintenance: Wednesday April 28 through Wednesday May 05, 8AM-4:00PM, There will be possible lane closures at various locations in Region IV in order to patch potholes on an as needed basis.
SHELBY COUNTY, I-55 at Mallory Avenue: I-55 is reduced to two lanes in each direction. Currently there is no access to Mallory Avenue (Exit 9) from Northbound I-55. Motorists should use the Third Street Exit (Exit 7) and detour to Mallory. Riverside Drive from Mallory Avenue to Devant Street is closed. Motorists should use the newly constructed Riverport Road extension as an alternate route.
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-155
REGION IV Maintenance: Wednesday April 28 through Wednesday May 05, 8AM-4:00PM, There will be possible lane closures at various locations in Region IV in order to patch potholes on an as needed basis.
DYER COUNTY, I-155 Bridge Repair: Monday April 26 through May 10, 7AM-7AM, Beginning at MM 9 in Missouri and extending to MM 1 in Tennessee. There will be one eastbound & one westbound lane closed. This work is for the re-painting of the steel structure and for concrete repairs and is a 24 hour closure.
DYER COUNTY Resurfacing and Bridge Deck Repairs on I-155 near the rest area LM-9.00 to US-51(SR-3) LM-15.93
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-65
TDOT Maintenance:
Davidson County
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
o I-65 southbound from mile marker 81 to mile marker 74
REGION 3 On-Call Guardrail: Thursday April 29 through Tuesday May 4, 8PM-6AM, (each night), There will be one lane closures at various locations on interstate routes in Davidson, Rutherford, and Robertson Counties for guardrail repair and installation.
REGION 3 Installation of Cable Barrier: Thursday April 29 through Wednesday May 5, 8PM-6AM, There will be one lane closed on I-65 northbound and southbound MM 96-98 in Davidson County, MM 53-61 in Williamson County, MM 98-101 in Sumner County, and MM 45-48 in Maury County. One lane will remain open.
DAVIDSON and WILLIAMSON COUNTIES, ITS Phase III:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
TDOT Utilities:Sunday May 2, 6AM-3PM, On I-40 & I-65, 300' south of Jo Johnson Ave. near MM 209 in Davidson County. This request by Nashville Electric Service for transferring transmission lines and pulling conductors strands over interstate system. Four rolling stop blocks are expected. Six police cars will be present.
DAVIDSON COUNTY, I-65 at the junction with SR 12 (Rosa Parks Blvd.):
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
SUMNER COUNTY, Bridge repair of two bridges on I-65 over U.S. 31W & on US 31W over US 41:
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
![](file:///C:/DOCUME~1/JJ03902/LOCALS~1/Temp/msohtmlclip1/01/clip_image001.gif)
I-69
Obion County, Future I-69 beginning 0.31 mile south of SR-5/SR-22 to 0.78 mile west of SR-21:May 3, 2010 thru November 3, 2011, crews will close Brevard Road, George Moss Road and Mt. Zion Road to through traffic. Detour signs will be posted to guide drivers around the construction area.
I-75
HAMILTON, BRADLEY, and MARION COUNTIES, I-75 / I-24 / SR-153 / SR-29 construction of an intelligent transportation system on various interstate and state routes in and near Chattanooga: The contractor will implement shoulder closures throughout this report period within the project area on weekdays between the hours of 9:00 AM and 4:00 PM and anytime on the weekend as part of the ITS construction. On weekdays during non-peak hours, the contractor will have a right lane closure on SR-29 South at MM 2.5. Three lanes are to remain open with third available lane used as acceleration lane for on-ramp from Manufacturers Road. There also may be weeknight lane closures throughout the project between the hours of 10:00 PM and 5:00 AM, nighttime weekend lane closures between the hours of 10:00 PM and 10:00 AM, and intermittent temporary stoppages of traffic (less than 15 minutes) at various locations throughout the project area to allow the contractor to perform ITS work. THP will assist with traffic control. Estimated completion date is December 2010.
HAMILTON COUNTY, I-75 widening project from 1.1 miles south of Lee Highway (SR-2, US-11) to 1.2 miles north of Lee Highway (SR-2, SR-11): The contractor will have a lane closure on the Northbound side of I-75 between the hours of 10:00 PM and 6:00 AM to accommodate new concrete paving operations. One lane of traffic will remain open at all times. The contractor will have lane closures on Hill Top Road, Hunter Road, Snow Hill Road, Mountain View Road, Lee Highway, and Old Lee Highway from 8:30 AM until 7:00 PM to construct new roadway and accommodate bridge construction. However, the contractor must move off the roadway from 2:30 PM until 3:00 PM each day during the shift change at Miller Industries. One lane will remain open at all times. Estimated completion date is December 2010.
LOUDON COUNTY, I-75 South near Mile Marker 68:On Monday, May 5, 2010, motorists should be alert for a lane closure between the hours of 8:30 a.m. and 6 p.m. as crews mill and resurface a section of roadway through this area. Motorists should be alert for workers present, expect potential long delays and use extreme caution through this area.
ANDERSON COUNTY, I-75 South between Exit 128 (Lake City) and Mile Marker 127: Motorists should be alert for workers present, equipment entering and exiting the roadway and use extreme caution through this noise wall construction project.
I-275
No construction activity to report at this time.
I-81
SULLIVAN COUNTY, I-81 North and South between Mile Markers 57 and 63:Motorists should be alert for lane closures on Sunday nights through Thursday nights between the hours of 7 p.m. to 6 a.m. the following morning as crews mill and resurface the roadway. Motorists should be alert for workers and equipment present and use extreme caution traveling through this area.
SULLIVAN COUNTY, I-81 North and South between Exit 69 and Exit 74:Motorists should be alert for lane closures on Sunday nights through Thursday nights between the hours of 7 p.m. to 6 a.m. the following morning as crews mill and resurface the roadway. Motorists should be alert for workers and equipment present and use extreme caution traveling through this area.
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.
Most work is weather dependent and subject to change due to inclement weather.