Middle Tennessee Construction October 27 – November 3, 2011
- Thursday October 27 through November 3: No closures scheduled.
- Saturday October 29, 8PM-5AM, There will be one lane closed on SR 386 eastbound in order to install permanent striping.
- Saturday October 29, 9AM-3PM, There will be mobile operations on SR 386 eastbound in order to stripe the roadway.
- Thursday October 27 through November 3: No closures scheduled.
- Thursday October 27 through Wednesday November 2, 9AM-3PM, There will be alternating lane closures on Central Pike from Lebanon Rd to Stoner’s Creek in order to install pipe and perform grading work. Flaggers will be utilized.
- Thursday October 27, 9PM-6AM, There will be one lane closed in each direction in order to install barrier rail. One lane will remain open in each direction.
- Thursday October 27, 8PM- 6AM, The right lane of the ramp from Briley Parkway SR 155 to I-65 North will be closed in order to replace existing overhead signs. The right lane of the ramp from Briley Parkway SR 155 to I-65 South will also be closed in order to replace existing overhead signs.
- Thursday October 27 through Wednesday November 2, 9AM-3PM, There will be alternating lane closures on Wilma Rudolph Blvd. (SR 13) southbound over the Red River in order to perform bridge work.
- Thursday October 27 through November 3: No closures scheduled.
- Thursday October 27 through Wednesday November 2, 7AM-4PM, (excluding weekends), There will be alternating lane closures on SR 25 in both directions for striping.
- Thursday October 27 through Wednesday November 2, 8PM-5AM, There will be temporary lane closures on I-65 North and South from SR 248 to SR 96 in order to pave.
- Thursday October 27 through Wednesday November 2, 9AM–3PM, There will be temporary lane closures on Mt. Juliet Road (SR-171) northbound and southbound, from Division Street to Lebanon Road, for storm sewer installation, base stone installation and excavation. There will also be temporary lane closures on Lebanon Rd. eastbound and westbound at the intersection of Lebanon Rd. and Mt. Juliet Rd.
- Thursday October 27 through November 3: No closures scheduled.
- Thursday October 27 through Wednesday November 2, 8PM- 6AM, The northbound lane of SR 109 will be closed in order to pour concrete.
- Thursday October 27 through Wednesday November 2, 8PM-3AM, (excluding weekends), The right lane will be closed on I-65 northbound at Rosa Parks Blvd. for vegetation and rock removal. One lane will remain open.
- Thursday October 27 through Wednesday November 2, 7PM-3AM, (excluding weekends), The right lane will be closed on Ellington Parkway between mile marker 11 and mile marker 14 for vegetation and rock removal. One lane will remain open.
- Monday October 31 through Wednesday November 2, 8PM-1AM, The right lane and center lane will be closed on I-40 westbound at mile marker 196.9 for pothole repair. The left lane will remain open.
- Thursday October 27 through Wednesday November 2, (excluding weekends), 9AM-12PM, There will be one lane periodically closed on I-24 in both directions in Robertson County to move equipment between mile marker 25 and mile marker 17.2 in order to trim vegetation overhanging the roadway. One lane will remain open. This is between exit 24 (Springfield and Ashland City) and exit 19 (Adams).
- Thursday October 27 through Wednesday November 2, (excluding weekends), 7PM-5AM, There will be one lane periodically closed on I-65 in both directions in Robertson County between mile marker 104 and mile marker 119 to mill, pave, and stripe the roadway in various locations. One lane will remain open.
- Now through Friday January 6, 2012, 9AM-7PM,(excluding weekends), On SR-65, Whites Creek Pike, starting 4100' north of Old Hickory Blvd to Knight Drive in Davidson County. This request, by Garney Construction is to open-cut for installation of 16" water main with service line renewals.
- Thursday October 27 and Monday October 31, 7PM-6AM, There will be lane closures at the intersection of Thompson Lane & Logan Street & SR-155. This request is from Piedmont Gas Co. to open-cut into the roadway to repair a leaking valve.
- Friday October 28, 9AM-10AM, There will be short term rolling lane closures at the following locations to test striping:
For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.