Middle Tennessee Construction December 8 – December 14, 2011

Thursday, December 08, 2011 | 07:11am
DAVIDSON COUNTY, I-440 Eastbound from I-65 to I-24
  • Thursday December 8 through December 14: No closures scheduled.
 DAVIDSON COUNTY, Repair of 14 Bridges over I-440
  • Thursday December 8 through Friday December 9, 9AM-3PM, There will be shoulder closures on I-440 eastbound at Acklen Park Bridge for bridge work. There will also be a lane shift on the Acklen Park Bridge for sidewalk repair.  
  • Monday December 12 through Wednesday December 14, 9AM-3PM, There will be shoulder closures on I-440 eastbound at Murphy Rd. Bridge for bridge work.
 
DAVIDSON & SUMNER COUNTIES, Miscellaneous Safety Improvements on SR 386
  • Thursday December 8 through Wednesday December 14, 9AM-3PM, There will be a left shoulder closure on SR 386 westbound ramp onto Conference Drive southbound in order to install signs. All lanes will remain open.
  • Thursday December 8 through Wednesday December 14, 9AM-3PM, There will be a left shoulder closure on SR 386 westbound ramp onto Saundersville Road in order to install signs. All lanes will remain open.
  • Sunday December 11 through Wednesday December 14, 8PM-6AM, There will be alternating lane closures on SR 386 beginning at I-65 in Davidson County to SR 174 (Long Hollow Pike) in order to perform striping and installation of snowplowable markers. One lane will remain open.
DAVIDSON COUNTY, Resurfacing on SR 6 from Church Street to SR 155
  • Monday December 12 through Wednesday December 14, 8PM-5AM, There will be one lane closed in each direction on the Victory Memorial Bridge on James Robertson Pkwy. in order to install bridge drains and bike grates. 
DAVIDSON COUNTY, Central Pike from US 70 to Stoners Creek
  • Thursday December 8 through Wednesday December 14, 9AM-3PM, There will be alternating lane closures on Central Pike from Lebanon Rd to Stoner’s Creek in order to install pipe and perform grading work. Flaggers will be utilized.
RUTHERFORD COUNTY, Widening of Waldron Road (Recovery Act Project)
  • Saturday December 10 and Sunday December 11, 6AM-5PM, There will be alternating lane closures on Waldron Rd. between I-24 and Ingram Blvd. for temporary striping. One lane will remain open in each direction.
WILLIAMSON COUNTY, Widening of I-65 from SR 248 (Goose Creek) to SR 96
  • Thursday December 8 through December 14: No closures scheduled.
DAVIDSON & WILSON COUNTIES, Miscellaneous Safety Improvements
  • Thursday December 8 through Tuesday December 13, 8PM-6AM, (excluding Saturday and Sunday), There will be one lane closed on the I-40 westbound ramp to SR 840 at LM 10.8 to LM 10.93 in order to install guardrail in Wilson County.
WILSON COUNTY, SR-171 (Mt Juliet Road) Widening:(Recovery Act Project)
  • Thursday December 8 through Wednesday December 14, 9AM–3PM, There will be temporary lane closures on Mt. Juliet Road (SR-171) southbound, from Division Street to Charlie Daniels Pkwy. for paving and installation of curb & gutter.
WILSON & SUMNER COUNTIES, Bridge Construction on SR 109 over the Cumberland River
  • Thursday December 8 through Wednesday December 14, 8PM- 6AM, The northbound lane of SR 109 will be closed in order to pour concrete.
TDOT Maintenance:
Davidson County 
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 8PM-3AM, The right lane will be closed on I-65 at Rosa Parks Blvd. for vegetation and rock removal. One lane will remain open. 
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 7PM-3AM, The right lane will be closed on Ellington Parkway between mile marker 11 and mile marker 14 for vegetation and rock removal. One lane will remain open.  
Hickman County
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-40 in both direction in Hickman County between mile marker 148 and mile marker 163 in order to patch potholes on an as needed basis. One lane will remain open.
Humphreys County
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 9AM-3PM, There will be temporary lane closures on I-40 in both direction in Humphreys County between mile marker 134 and mile marker 148 in order to patch potholes on an as needed basis. One lane will remain open.   
  • Thursday December 8, 6PM-11PM, There will be temporary lane closures on I-40 eastbound in Humphreys County between mile marker 143 and mile marker 148 in order to pave various locations. One lane will remain open.
Cheatham County
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 7PM-5AM, There will be one lane periodically closed on I-40 in both direction in Cheatham County between mile marker 186 and mile marker 192 in order to patch potholes in the concrete bridge decks. One lane will remain open.
Montgomery & Robertson Counties 
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 9AM-12PM,  There will be one lane periodically closed on I-24 in both directions in Montgomery and Robertson Counties to move equipment between mile marker 25 and mile marker 14 in order to trim vegetation overhanging the roadway. One lane will remain open. This is between exit 24 (SR-49/Springfield and Ashland City) and exit 11 (SR-76/Adams-Clarksville).
  • Thursday December 8 through Wednesday December 14, (excluding weekends), 7PM-5AM, There will be one lane periodically closed on I-65 in both directions in Robertson County between mile marker 104 and mile marker 119 to mill, pave, and stripe the roadway in various locations. One lane will remain open.
 
TDOT Utilities
  • Now through Friday January 6, 2012, 9AM-7PM,(excluding weekends), On SR-65, Whites Creek Pike, starting 4100' north of Old Hickory Blvd to Knight Drive in Davidson County. This request, by Garney Construction is to open-cut for installation of 16" water main with service line renewals.
 
Geotechnical Drilling on I-65 at Trinity Lane
  • Monday December 12 through Wednesday December 14, 8PM-5AM, There will be alternating lane closures on I-65 north and southbound just north of the Trinity Lane exit in order to perform geotechnical drilling for future project design. Three lanes will remain open.
 
Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity. Information in this report is provided to the Department of Transportation by the contractors. Most work is weather dependent and subject to change due to inclement weather. For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.

Press Releases | Road Closures