Middle Tennessee Construction July 14 – July 20, 2011
- Thursday July 14, 8PM-5AM and Friday July 15, 8PM-12 Midnight, Three lanes in each direction of I-40 will be closed for bridge work, paving, and texture coating median wall.
- Thursday July 14, 8PM-5AM and Friday July 15, 8PM-12 Midnight, There will be alternating closures on Robertson Road for grooving and striping.
- Thursday July 14 through Wednesday July 20, 9PM-5AM and Saturday July 16, 6AM-6PM, There will be alternating lane closures on Rosa Parks Blvd. for curb and median work and to install traffic and pedestrian signals and pave.
- Monday July 18 through Wednesday July 20, 9PM-5AM, There will be alternating lane closures on I-65 northbound and southbound in order to pave the tie ins at the ramps.
- Saturday, July 16, 6AM-10AM, I-24 westbound left lane & shoulder will be closed for barrel delineator removal.
- Thursday July 14 through Wednesday July 20: No closures scheduled.
- Thursday July 14 through Wednesday July 20, 8PM-6AM, There will be temporary lane closures on SR 386 northbound from I-65 to Center Point Rd. in order to perform road work.
- Thursday July 14 through Wednesday July 20, 8PM-5AM, There will be alternating lane closures on Ellington Pkwy. in order to mill and pave the roadway.
- Friday July 15, 8PM through Monday July 18, 5AM, There will be alternating lane closures on Ellington Pkwy. southbound between Spring St. and Cleveland St. in order to perform concrete repairs.
- Thursday July 14 through Wednesday July 20, 8PM-6AM, (excluding Saturday), There will be alternating lane closures on Charlotte Pike in order to pave and stripe the roadway.
- Thursday July 14 through Wednesday July 20, 9AM-3PM, Saturday July 16, 7AM-4PM, (excluding Sunday), There will be lane closures on 2nd and 4th Ave. for milling, adjusting castings, and sidewalk repair.
- Thursday July 14 through Wednesday July 20, 9AM-3PM, There will be alternating lane closures on Central Pike from Lebanon Rd to Stoner’s Creek in order to install pipe. Flaggers will be utilized.
- Thursday July 14 through Wednesday July 20, 8PM-6AM, There will be alternating laneclosures on I-40 eastbound and westbound from MM 148-182 in order to fog seal the shoulders and place permanent striping.
- Thursday July 14 through Wednesday July 20, 8PM-6AM, There will be one lane closed on I-24 eastbound and westbound from MM 11.0 to MM 0.0 for paving operations.
- Thursday July 14 through Wednesday July 20, 9AM-3PM, There will be alternating lane closures on Wilma Rudolph Blvd. (SR 13) southbound over the Red River in order to perform bridge work.
- Thursday July 14 through Wednesday July 20, 8PM-5AM, There will be alternating lane closures on SR 1 eastbound and westbound in order to mill the roadway.
- Thursday July 14 through Wednesday July 20: No closures scheduled.
- Thursday July 14 and Friday July 15, 8PM-5AM, There will be alternating lane closures on I-65 southbound and northbound between SR 96 and MM 62.6 in order to remove barrier rail.
- Thursday July 14 through Wednesday July 20, 12 Noon, There will be a rolling roadblock on I-65 northbound and southbound just south of SR 96 in order to blast for a retaining wall.
- Thursday July 14 through Wednesday July 20, 9AM-3PM, There will be lane closures on SR 109 from I-40 to US 70 in both directions for paving and striping of the roadway.
- Thursday July 14 through Wednesday July 20, 9AM–3PM, (excluding weekend), There will be temporary lane closures on Mt. Juliet Road (SR-171) northbound and southbound from Division St. to Lebanon Road for installation of base stone, sidewalks, and driveways.
- Tuesday July 19 and Wednesday July 20, 8PM-3AM, I-65 in both directions between mile marker 87 and mile marker 90 two left lanes will be closed for milling and paving and crack sealing. Two lanes will remain open.
- Wednesday July 20, 9AM-3PM, There will be one lane closed on State Route 49 eastbound at mile marker 20.5 for placing an 18 inch pipe under roadway. One lane will remain open.
- Thursday July 14 through Wednesday July 20, (excluding weekends), 9AM-4PM, There will be one lane closed periodically on I-24 westbound in Montgomery County between mile marker 8 and mile marker 11 in order to trim vegetation overhanging the roadway. One lane will remain open. Exit 11 is State Route 76 (Adams and Clarksville Exit), and Exit 8 is State Route 237 (Rossview Road Exit).
- Thursday July 14 through Wednesday July 20, (excluding weekends), 9AM-4PM, There will be one lane closed periodically on I-24 in both directions in Robertson County between mile marker 25 and mile marker 18 in order to trim vegetation overhanging the roadway. One lane will remain open. This is between exit 24 (Springfield and Ashland City) and Exit 19 (Adams).
- Thursday July 14 through Wednesday July 20, (excluding weekends), 9AM-3PM, There will be periodic lane closures in Robertson County on State Route 161 between the 0 mile marker and the 1.0 mile marker in order to mill, pave and stripe the roadway.
- Thursday July 14 through Wednesday July 20, (excluding weekends), 9AM-3PM, There will be periodic lane closures in Robertson County on State Route S.R. 65 (U.S. 431) between the 7.4 mile marker and the 8 mile marker in order to mill, pave and stripe the roadway.
- Monday July 18 through Thursday July 21, 9AM-3PM, There will be a lane closures in both directions at each bridge on I-40, from the Wilson/Smith County line-MM 252 to the Smith/Putnam County line-MM 267 for bridge inspection.One lane will remain open.
- Tuesday July 12 through Friday July 15, 6AM-6PM, There will be one lane closed on State Route 174 in both directions in Sumner County between mile marker 14.7 and mile marker 15.5 for milling and paving. One lane will remain open.
- Sunday July 17 through Thursday July 21, 7PM-6AM, On Charlotte Pike SR-24 from 54th Ave. to Orlando Ave. in Davidson County. This request by Piedmont Natural Gas Co. to replace 1000' of 2" gas main and one road crossing.
- Now through Friday January 6, 2012, 9AM-7PM,(excluding weekends), On SR-65, Whites Creek Pike, starting 4100' north of Old Hickory Blvd to Knight Drive in Davidson County. This request, by Garney Construction is to open-cut for installation of 16" water main with service line renewals.
For more information on this or any other TDOT road construction project or to view travel conditions in this area visit the TDOT SmartWay Information System web site ( http://www.tn.gov/tdot/tdotsmartway/ ). People can also dial 511 from any land-line or cellular phone to access up to date traffic conditions, or visit www.TN511.com ( http://www.tn511.com/ ). TDOT is also now on Twitter. For up to date traffic tweets for the Nashville area follow Nashville511 ( http://twitter.com/nashville511 ) on Twitter. For statewide traffic tweets just follow TN511 ( http://twitter.com/TN511 ). Motorists are reminded to use all motorist information tools responsibly. Drivers should refrain from texting, tweeting or using a mobile phone while operating a vehicle. TDOT advises drivers to “Know before you go!” by checking traffic conditions before leaving for your destination.