Middle Tennessee Construction Report, March 28th- April 3rd, 2013

Thursday, March 28, 2013 | 05:49am

Middle Tennessee Construction

March 28th—April 3rd, 2013

DAVIDSON COUNTY, Widening of I-65 from Trinity Lane to Dickerson Rd.

  • No lane closures this week.

DAVIDSON COUNTY, I-440 Eastbound from I-65 to I-24

  • No lane closures this week.

DAVIDSON COUNTY, Bridge Construction on Gallatin Rd. over the CSX Railroad

  • From now through March 2013, Gallatin Rd. will be reduced to one lane in each direction in this area.

DAVIDSON COUNTY, Resurfacing on I-24 from I-440 to Haywood Lane

  • Monday April 1 and Wednesday April 3 8PM-6AM, The inside lane of I-24 eastbound and westbound will be closed in order to repaint the median barrier wall.

DAVIDSON COUNTY, Resurfacing on SR 254 (Bell Rd.) from Blue Hole Rd. to Murfreesboro Rd. Including Bridge Deck Repair

  • Monday April 1 through Wednesday April 3, 9PM-6AM, There will be alternating lane closures on Bell Rd. in order to mill the roadway and install loop wire.

DAVIDSON COUNTY, Repair of the I-24 (Silliman Evans) Bridge over Nashville & Eastern Railroad

  • Monday April 1 through Wednesday April 3, 9AM-3PM, There will be alternating one lane closures on Hermitage Avenue to touch up paint.

Looking Ahead:

  • Friday April 5, 8PM through Monday April 8, 6AM, The right lane of I-40 westbound will be closed under I-24 in order to sandblast and prime the Silliman Evans Bridge.

DAVIDSON COUNTY, Bridge Repair on 3rd Ave. over I-65

  • From now through April 2013, Third Ave. Bridge will be reduced to one lane.

DAVIDSON COUNTY, Bridge Construction on Dickerson Rd. over Dry Creek

  • From now through April 2013, Dickerson Rd. will be reduced to one lane in each direction from Dry Creek Rd. to Robert Cartwright Dr. in Goodlettsville (LM 22.09).

DAVIDSON COUNTY, Resurfacing on SR 12 from Briley Pkwy, to the Cheatham Co. Line

  • Monday April 1 through Wednesday April 3, 8PM-6AM, There will be alternating lane closures in order to mill the roadway.

DAVIDSON COUNTY, On Call Concrete Repair

  • Thursday March 28 thru Wednesday April 3, 6AM-8PM, (excluding holiday weekend), The traffic on the ramp from Franklin Rd (SR6) to Woodmont Blvd. / Thompson Ln. (SR155) will be shifted in order to perform concrete pavement repair.

WILLIAMSON COUNTY, Widening of I-65 from SR 248 to SR 96

  • Thursday March 28, 9AM-3PM, The right lane of I-65 southbound will be closed from SR 96 to the Harpeth River Bridge to perform punch list work on the noise wall.

WILLIAMSON COUNTY, Construction on SR 397 (Mack Hatcher Pkwy) South of SR 96 to SR 6

  • From now through December 2013, The inside lanes of Mack Hatcher Pkwy. in both directions approximately ½  west of the Franklin Rd intersection will be closed in order to  perform median work and work on the next phase of construction.
  • Thursday March 28 through Wednesday April 3, 9AM-3PM, (excluding holiday weekend), There will be alternating lane closures on Liberty Pike eastbound and westbound in order to remove curb and gutter and perform grading work.

WILLIAMSON COUNTY, City of Franklin Construction

  • From now through November 2013, Hillsboro Road (SR 106) will be reduced from four lanes to two lanes between SR 96 and Independence Square to begin utility relocation for a sidewalk project.

Performance Based Maintenance Work on I-24, I-65 and SR 840

  • Thursday March 28 through Wednesday April 3, 9AM-3PM, (excluding holiday weekend), There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:
    • SR 840, Williamson, Rutherford and Wilson
    • I-24, Rutherford and Bedford
    • I-65, Williamson
  • Thursday March 28 through Wednesday April 3, 8PM-5AM, (excluding holiday weekend), There will be possible lane closures at the following locations on State Routes and Interstates in Middle Tennessee to repair guardrail on an as needed basis:
    • SR 840, Williamson, Rutherford and Wilson
    • I-24, Rutherford and Bedford
    • I-65, Williamson

MAURY COUNTY, Bridge Construction on SR 50 over I-65

  • From now through June 2013, SR 50 will be reduced to one lane in this area due to repair of the bridge.  Signalization is in place.
  • Monday April 1 through Wednesday April 3, 8PM-6AM, There will be alternating lane closures on I-65 northbound and southbound at MM 37.0 in order to perform overhead bridge work.

MONTGOMERY COUNTY, Resurfacing and Bridge Deck Repair on I-24 from SR 76 to the Robertson Co. Line

  • Monday April 1 through Wednesday April 3, 8PM-6AM, There will be one lane closures on I-24 eastbound and westbound in order to work on parapet rails.

WILSON COUNTY, I-40 Widening from Central Pike to East of SR 109

  • Monday April 1 through Wednesday April 3, 8PM-5AM, There will be alternating lane closures on I-40 eastbound and westbound in order to mill and pave the roadway.  One lane will remain open in each direction.

WILSON & SUMNER COUNTIES, Bridge Construction on SR 109 over the Cumberland River

  • Thursday March 28 through Wednesday April 3, 9AM-3PM, (excluding holiday weekend), There will be alternating lane closures on SR 109 northbound and southbound for utility line relocation work.

TDOT Maintenance:

Middle Tennessee

  • Thursday March 28 until 6PM and Monday April 1 through Wednesday April 3, 9AM-3PM,  There will be possible lane closures at various locations on State Routes and Interstates in Middle Tennessee to patch potholes on an as needed basis:
  • I-24 Cheatham, Davidson, Montgomery and Robertson Counties
  • I-65 Davidson, Robertson, Williamson Counties
  • I-40 Cheatham, Davidson, Dickson, Hickman, Humphreys Counties

Davidson County

  • Thursday March 28 until 6PM and Monday April 1 through Wednesday April 3, 9AM-3PM and 7PM-1AM, There will be various shoulder closures in Davidson County for rock removal on all interstates.  All lanes will remain open.   
  • Thursday March 28 until 6PM and Monday April 1 through Wednesday April 3, 8PM-1AM, There will be alternating lane closures on various state routes for crack sealing.  One lane will remain open.  

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather.  For travel information visit the TDOT SmartWay web site at www.tn.gov/tdot/tdotsmartway or call 5‑1‑1.  You can also receive traffic alerts via TDOT’s multiple Twitter feeds, including statewide traffic tweets @TN511 or Nashville area alerts @Nashville511

Android and iPhone users can download TDOT’s SmartWay Mobile App to assist them in navigating Tennessee highways.  The app provides up-to-the-minute customized traffic information and enables the user to access TDOT’s SmartWay cameras, messages displayed on overhead Dynamic Message Signs, and information on construction related lane closures and incidents on interstates and state routes.  The TDOT SmartWay App is free and available for download in the Apple App Store and Play Store for Android. 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for their destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.

 

For More Information Contact:

Deanna Lambert, TDOT Region 3 Community Relations Officer

Deanna.Lambert@tn.gov

615-854-5650 cell

###

Press Releases | Road Closures