TDOT Weekly Construction Report for Middle Tennessee, November 3-9

Wednesday, November 02, 2016 | 12:51pm

CHEATHAM COUNTY, Pothole repair at the bridge of I-40 eastbound (MM 188)

  • Thursday, November 3, 7PM-6AM, There will be a lane closure on I-40 eastbound for pothole repair.

 

DAVIDSON COUNTY, On-call signing on I-40

  • Friday and Saturday, November 4 and 5, 9AM-3PM,  There will be a shoulder closure on I-40 westbound at McCrory lane (MM 192) to install footings.

 

DAVIDSON COUNTY, Grading, drainage, and paving on I-40 EB at the interchange of I-440

  • Friday, November 4, Monday November 7, Wednesday November 9, 12PM-2PM, There will be rolling roadblocks on I-40 in both directions for blasting.

 

DAVIDSON COUNTY, Repair of 6 Bridges at I-440/I-65 Interchange over US31 (SR 6, Franklin Pike)

  • From now through May 2017, There will be lane shifts on I-440 and I-65 at the 440/65 junction to perform deck repairs, expansion joint repairs, and approach slab repairs.

 

DAVIDSON COUNTY, Resurfacing and Bridge Repair on I-65 from Trinity Lane to Cumberland River Bridge

  • Thursday and Friday, November 3 and 3, 8PM-5AM, There will be lane closures on I-65 in both directions from the Trinity Lane bridge to the Cumberland River bridge and Spring Street bridge for resurfacing operations.

                                             

DAVIDSON COUNTY, Resurfacing on SR 45 (Old Hickory Blvd) from US 70 to I-40 eastbound ramp

  • Nightly (excluding Friday and Saturday), 8PM-6AM, There will be alternating lane closures on SR 45 from US 70 (SR 24) to North of the I-40 eastbound ramp in Nashville in both directions for milling, traffic signal loops, and casting adjustments. One lane will remain open.

 

DAVIDSON COUNTY, Concrete Ramp Repair from SR 155 westbound to US 31 (Exit 14A)

  • Thursday, November 3, 8PM-5AM, Traffic will be shifted for saw cutting concrete.
  • Friday, November 4, 8PM through Monday November 7, 5AM, Traffic will be shifted to remove and replace concrete.     

 

DAVIDSON COUNTY, On-call pavement markings on US-70

  • Thursday, November 3, 8PM-5AM, There will be moving lane closures on Harding Pike to install snowplowable markers.

 

DICKSON COUNTY, On-call signing on I-40

  • Friday November 4 and Saturday November 5, 9AM-3PM, There will be a shoulder closure on I-40 in both directions at MM 171-174 to install footings.

 

MACON COUNTY, Reconstruction of SR 10 from south of Goose Creek to SR 52

  • From now through December 2016, SR 10 has been reduced to one lane for construction activities. Temporary signals control traffic flow. Drivers are encouraged to use alternate routes.  

 

MAURY COUNTY, Intersection Improvement at the intersection of SR 50 and SR 245

  • From now through January 2017, There will be lane closures on SR 245 at the intersection of SR 50 (James Campbell Blvd.) for grading and drainage work.

 

ROBERTSON COUNTY, ITS Expansion

  • Nightly (excluding weekends), 9PM-6AM, There will be lane closures on I-65 in both directions at MM 101 to install guardrail.  

 

RUTHERFORD COUNTY, Performance-based maintenance work on I-24

  • Wednesday, November 11, 8PM-5AM, There will be alternating lane closures on I-24 westbound at MM 90 for asphalt repairs.

 

SMITH COUNTY, Bridge Repair on SR 80 over Peyton Creek

  • From now through January 2017, SR 80 will be reduced to one lane at the bridges over Peyton Creek (LM 5.75 and LM 7.00) near Sawmill Lane for bridge repair work. Temporary traffic signals will be in place.

 

SUMNER COUNTY, Miscellaneous safety improvements on SR 109 at the intersection of Old SR 109

  • Nightly, 8PM-6AM, There will be alternating lane closures on SR 109 for construction operations. At least one lane will remain open.

 

WILLIAMSON COUNTY, Resurfacing on SR 397 (Mack Hatcher) from US 31 (SR 6) (LM 0.00) to SR 96 (LM 3.20) in Franklin

  • Thursday, November 3 through Wednesday November 9, 9AM-3PM, There will be alternating lane closures on SR 397 (Mack Hatcher) from US 31 (SR 6) to SR 96 for fog seal installation. One lane will remain open at all times.

 

WILLIAMSON COUNTY, Performance-based maintenance on I-65

  • Monday, November 7, 8PM-5AM, There will be lane closures on I-65 southbound at Moore’s Lane for barrier wall drain cleaning.

 

 

Maintenance

 

Davidson County

  • Thursday, November 3, 8PM-Midnight There will be lane closures on SR 155 (Briley Parkway) northbound at Opry Mills for milling and paving operations. At least two lanes will remain open at all times.
  • Bridge Inspection Training, Thursday November 3 and Friday November 4, There will be a lane closure on the I-40 westbound off ramp at Briley Parkway for ridge inspection training.

 

Smith County

  • Thursday, November 3, 7PM-3AM, There will be a lane closure on I-40 eastbound between at MM 254 for paving operations. One lane will remain open at all times.

 

Utilities

  • Sunday, November 6, 7AM-5PM, There will be a lane closure for S&W electric to repair lighting on I-65 from Bakers Bridge Road to Concord Road (MM 71).
  • Sunday, November 6, 6AM-11AM, There will be rolling roadblocks on I-24 at exit 24 (Pleasant View) to place fiber optic cable.

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel.

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.