Middle Tennessee Construction Lane Closures, October 25-31, 2018

Thursday, October 25, 2018 | 08:15am

CHEATHAM-ROBERTSON-DAVIDSON COUNTIES, I-24 Resurfacing

  • Nightly, 8PM-6AM (excluding Friday, Saturday), There will be nightly lane closures on I-24 in both directions, between mile markers 24 and 37, for striping operations. There will also be miscellaneous paving operations at MM 9.3 and between MM 17-24.

 

DAVIDSON COUNTY, I-40 Resurfacing from west of Church Street to east of Arlington Avenue (MM 209-213)

  •  Nightly (excluding Saturdays) 8PM-5AM, There will be alternating lane closures on I-40 in both directions for milling and paving. There will be intermittent ramp closures for milling.

     

DAVIDSON COUNTY, Repair of the bridge over 46th Avenue on I-40

  • Starting Friday, October 26 at 8PM through Monday, October 29 at 5AM, The southbound lane of 46th Ave. will be closed for bridge beam repair of the I-40 bridge over 46th Ave. Detours will be in place. I-40 will not be impacted.

 

DAVIDSON COUNTY, Interstate 440 Reconstruction

  • Nightly, 9PM-5AM, There will be intermittent shoulder and lane closures for preliminary surveying and field design work.

 

DAVIDSON COUNTY, Intersection Improvements at SR 6 (Franklin Rd) and SR 266 (Harding Place/Battery Lane)

  • Daily, 9AM-3PM, There will be a right lane closure northbound for milling and paving. At least one lane will remain open.

 

DAVIDSON COUNTY, Resurfacing SR 254 (Old Hickory Blvd.) from Granny White Pike to SR 6

  • Nightly 8PM-5AM, There will be alternating nightly lane closures in both directions for milling.

     

DAVIDSON COUNTY, SR 1 Grading, Drainage, Signals, and Paving from Vultee Boulevard to Jupiter Drive

  • Daily, 9AM-3PM, There will be a lane closure southbound for box culvert work. There will also be a lane closure northbound for drainage work. At least one lane will remain open each direction at all times.

 

DAVIDSON COUNTY, Bridge Replacement on Hillwood Blvd

  • From now through July 2019, Hillwood Blvd. will be closed from SR 1 (Harding Pike) to Post Road for bridge replacement. A signed detour will be in place.

 

DICKSON-WILLIAMSON COUNTIES, Construction On I-40 Eastbound Near (M.M. 180) For A Truck Climbing Lane

  • Nightly, 8PM-5AM, There will be a temporary lane closure on I-40 eastbound between MM 180 and 183 in order to shift traffic and pave the mainline.

 

MAURY COUNTY, New Interchange Construction at SR 166 and US 43 (SR 6/Lawrenceburg Hwy), including a concrete bulb-tee beam bridge in Mount Pleasant

  • Daily, 9AM-3:30PM, There will be temporary lane closures and rolling roadblocks on US 43 near SR 166 for blasting and hauling material.

 

MAURY COUNTY, Widening of Beechcroft Rd from Cleburn Rd to McCormick Crossing

  • Daily, 9AM-3:30PM, There will be temporary lane closures on SR 247 for widening and utility activities.

 

MAURY-WILLIAMSON COUNTIES, SR 247 (Duplex Road) from US 31 to Secluded Lane

  • Daily, 9AM-3:30PM, There will be temporary lane closures for paving, widening, and utility activities.  Miles Johnson South is closed per contract and expected to be completed by late November.

 

MONTGOMERY COUNTY, SR 149 and SR 13 Grading, Drainage, and Construction of Bridge, Retaining Wall and Paving from River Road to Zinc Plant Road

  • Daily, 9AM-3PM, There will be periodic flagging operations along SR 13 and SR 149 for clearing and grade work operations.

  • Starting now through summer 2019, Mayhew Road under the McClure Bridge will be closed.

 

MONTGOMERY COUNTY, SR 374 (Warfield Boulevard) Widening from South of Dunbar Cave Road to West of Stokes Road

  • Thursday October 25 and Tuesday, October 30, 9AM-3:30PM, There will be intermittent road closures on Warfield Blvd, between Dunbar Cave Road and Stokes Road, for pre-split blasting. All traffic will be halted during the blasting process until all debris is removed from roadway.

 

RUTHERFORD COUNTY, The repair of I-24 from East of the CSX railroad to the East of Epps Mill Overpass,

  • Daily, 7PM-5AM, There will be alternating lane closures in both directions from MM 81-89 to repair the asphalt.  There will be one lane open in each direction at all times.

 

RUTHERFORD COUNTY, SR 1 (South Lowry Street) Resurfacing from Davidson County Line to Pilkerton Drive

  • Nightly, 8PM-5AM (excluding weekends), There will be alternating lane closures on (US70, SR1) for pavement markings. One lane will remain open in each direction.

 

RUTHERFORD COUNTY, SR 266 (Sam Ridley Parkway) Resurfacing from I-24 Interchange to Threet Industrial Road

  • Nightly, 8PM-5AM (excluding weekends), There will be alternating lane closures on Sam Ridley Parkway, from the I-24 interchange to Threet Industrial Road, for pavement markings. One lane will remain open in each direction.

 

RUTHERFORD COUNTY, The resurfacing on SR 96 from Middle TN Blvd. (L.M. 12.72) to SR 268 (L.M. 16.73)

  • Daily, 9AM-3PM, There will be alternating lane closures on SR 96 for concrete work and pavement markings.

 

RUTHERFORD COUNTY, SR 99 resurfacing from south Rutherford Blvd (LM 21.61) to west of Wilson Overall Road (LM 24.52)

  • Daily, 8AM-3PM, There will be temporary lane closures for various construction activities. One lane will remain open at all times.

 

RUTHERFORD COUNTY, The resurfacing on SR 10 from SR 268 to the Wilson County Line

  • Daily, 9AM-3PM, There will be alternating lane closures on SR 10 for paving operations.

 

RUTHERFORD COUNTY, SR 99 resurfacing from E. of Clearidge Drive (LM 12.45) to W. of Veterans Pkwy (LM 13.88)

  • Daily, 8AM-2:30PM (excluding weekends), There will be temporary lane closures for various construction activities. One lane will remain open at all times.

 

SMITH COUNTY, Resurfacing on SR 53 from SR 141 to SR 264

  • Daily, 8:30AM-2:30PM (excluding Sundays), There will be possible lane closures for paving and guardrail installation. One lane will remain open.

 

SMITH COUNTY, Resurfacing on SR 263 from SR 25to SR 85

  • Daily, 9AM-3PM, There will be possible lane closures for paving. One lane will remain open.

 

SMITH COUNTY, Resurfacing on SR 264 from SR 141 to SR 24

  • Daily, 9AM-3PM (excluding Sundays), There will be possible lane closures for paving. One lane will remain open.

 

WILLIAMSON COUNTY, Intersection Safety Improvements at SR 106 (US 431/Lewisburg Pike) and Critz Lane

  • Daily, 9AM-3:30PM, There will be temporary lane closures on SR 106, between SR 106 and Critz Lane, for trucks hauling material on site for paving operations.

 

WILLIAMSON COUNTY, SR 6 (Franklin Road) Grading, Drainage, and Paving from south of Moores Lane to Concord Road

  • Daily, 9AM-3PM, There will be intermittent stoppages of traffic and/or temporary lane closures (one direction at a time) for various construction activities and utility work throughout the project.

 

WILSON COUNTY, SR 141 (Hartsville Pike) Widening from South of Spring Creek to North of Lovers Lane

  • Daily, 6AM-6PM (excluding Sundays), There will be temporary lane closures on Hartsville Pike, from Spring Creek to Lovers Lane, for blasting and construction activities. One lane will remain open.

 

WILSON COUNTY, The reconstruction on SR 109 from North of US 70( SR24) to South of the Cumberland River

  • From now through November 2, 9AM-3:30PM, There will be periodic flagging operations along Academy Rd and SR 109 for paving and traffic swap. Check message boards in the area for signal activation date.

  • Daily, 9AM-3:30PM, Cleary waterline crossing at East Laguardo Road.         

 

 

 

>>> MAINTENANCE & UTILITIES

 

 

DAVIDSON COUNTY

  • Daily (excluding weekends) 7AM-5PM, There will be a lane closure on Whites Creek Pike (SR 65) between Moorman's Arm Rd. and Pierpoint Dr. for box culvert installation and replacement of driveway crossings.

  • Daily, 9AM-3PM, There will be alternating lane closures on SR 100 at Pasquo road for replacing storm drainage and installation of conduit for traffic signals, along with paving work. Traffic control will be utilized. One lane will remain open.

 

RUTHERFORD COUNTY

  • Sunday, October 28, 6AM-8AM, There will be rolling road blocks on I-840 at Blackman Road for AT&T to overlash fiber.

 

WILLIAMSON COUNTY

  • Sunday, October 28, 6AM-11AM, Crown-Castle will have rolling roadblocks on SR 441, (Moore's Lane), Exit 69, in Williamson County for F/O installation. 

  •  

WILSON COUNTY

  • Daily, 9AM-3PM, There will be rolling roadblocks on SR 109, between Callis Road and I-40, for rock blasting/excavation. Additionally, traffic will be reduced to one lane in both directions at the intersection of SR 109 and Callis Road for construction of turn lane and crossover.

  • Daily, 9AM-3PM, There will be alternating lane closures on SR 265 (Central Pike) for installation of domestic water line at LM 4.

  • Daily, 9AM-3PM, SR 10 will be reduced to one lane for gas line installation from Vesta Road to Flat Woods Road.

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather. 

 

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.