Middle Tennessee Weekly Construction Lane Closures, June 21-27, 2018

Thursday, June 21, 2018 | 03:31pm

CHEATHAM-ROBERTSON-DAVIDSON COUNTIES, I-24 Resurfacing

·        Thursday, June 21 through Wednesday, June 27 (excluding weekends), 8PM-6AM, There will be nightly lane closures on I-24 in both directions, between mile makers 24 and 37, for milling and paving operations. State Troopers will be utilized for traffic control.

DAVIDSON COUNTY, I-40 Resurfacing from Cheatham County Line to US 70S (SR 1)

·        Sunday, June 24 through Wednesday, June 27, 8PM-5AM, There will be alternating lane closures on I-40 in both directions, between mile markers 191 and 196, for paving operations. One lane will remain open in each direction.

DAVIDSON COUNTY, I-40 Resurfacing from west of Church Street to east of Arlington Avenue

·        Thursday, June 21 AND Monday, June 25 through Wednesday, June 27, 8PM-5AM, There will be alternating lane closures on I-40 in both directions, at 2nd and 4th Avenues, for expansion joint removal. One lane will remain open.

·        Friday, June 22 at 8PM through Monday, June 25 at 6AM, The I-65 North ramp (Exit 82A) to I-40 West will be CLOSED and the I-40 East ramp (Exit 210) over I-65 North (at the same location) will be reduced to ONE LANE for bridge repairs. Detours will be in place for I-65 northbound traffic.

DAVIDSON COUNTY, I-65 and SR 155 (Briley Parkway) Noise Wall Repair

·        Thursday, June 21 through Wednesday, June 27 (excluding weekends), 8PM-5AM, There will be lane closures on I-65 in both directions, near mile marker 94, for noise wall replacement.

DAVIDSON COUNTY, SR 1 Grading, Drainage, Signals, and Paving from Vultee Boulevard to Jupiter Drive

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be intermittent lane closures on Murfreesboro Road in both directions from Vultee Boulevard to Jupiter Drive, for box culvert deliveries. At least one lane will remain open at all times.

DAVIDSON COUNTY, SR 1 (Murfreesboro Pike/Lafayette Street) MTA TSP Bus Work (Local Project)

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be an alternating shoulder and lane closures on Murfreesboro Pike in both directions, between Polk Avenue and Harding Place, for sidewalk work. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be an alternating shoulder and lane closures on Murfreesboro Pike in both directions, between Polk Avenue and Bell Road, for installing traffic signals. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be an alternating shoulder and lane closures on Murfreesboro Pike in both directions, between Foster Avenue and Bell Road, for excavation, directional drilling, and pouring foundations. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be an alternating shoulder and lane closures on SR 254 (Bell Road) in both directions, between Murfreesboro Pike and Hickory Hollow Lane, for excavation and directional drilling. Cones, signage, and traffic control will be utilized. At least one lane will remain open.              

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be an alternating shoulder and lane closures on Lafayette Street in both directions, between 2nd Avenue and Arlington Avenue, for utility work. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

·        Thursday, June 21 through Wednesday, June 27, weekdays 9AM-3PM, weekends 6AM-3PM, There will be an alternating shoulder and lane closures on Murfreesboro Pike in both directions, between Lester Avenue and UNA-Antioch Pike, for paving. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

·        Saturday, June 23 through Sunday, June 24, 6AM-3PM, There will be an alternating shoulder and lane closures on Murfreesboro Pike in both directions, between Claiborne Street and Spence Lane, for grinding and striping. Cones, signage, and traffic control will be utilized. At least one lane will remain open.                                

·        Saturday, June 23, 6AM-3PM, There will be an alternating shoulder and lane closure on Murfreesboro Pike in both directions at Fesslers Lane for installing traffic signals. Cones, signage, and traffic control will be utilized. At least one lane will remain open.

DAVIDSON COUNTY, SR 254 (Old Hickory Boulevard) Resurfacing from SR 106 (Hillsboro Road) to Granny White Pike

·        Thursday, June 21 through Wednesday, June 27 (excluding weekends), 9AM-3PM, There will be a lane closure on Old Hickory Blvd, from Hillsboro Road to  Granny White Pike, to finalize paving operations. One lane will remain open. Flaggers will be utilized.

DAVIDSON COUNTY, Intersection improvements on SR 6 (Franklin Road) at SR 255 (Harding Place/Battery Lane) and Northbound on Franklin Road to South Curtiswood Lane

·        Thursday, June 21 through Wednesday, June 27, 8PM-5AM, There will be lane closures on Franklin Road near the Harding Place/Battery Lane intersection for milling and paving operations. One lane will remain open in each direction.

DAVIDSON-SUMNER COUNTIES, SR 386 (Vietnam Veterans Boulevard) Resurfacing from I-65 to Forest Retreat Road

·        Thursday, June 21 through Wednesday, June 27, 8PM-5AM, There will be lane closures on Vietnam Veterans Pkwy, from mile marker 0.00 in Davidson County to mile marker 4.30 in Sumner County, for paving and epoxy coating.

·        Friday, June 22 at 8PM through Monday, June 25 at 5AM, There will be lane closures on Vietnam Veterans Pkwy, from mile marker 0.00 in Davidson County to mile marker 4.30 in Sumner County, for epoxy overlay. One lane in each direction will remain open at all times.

LOOK AHEAD

o   Friday, July 6 at 8PM through Monday, July 9 at 5AM, There will be lane closures on Vietnam Veterans Pkwy, from mile marker 0.00 in Davidson County to mile marker 4.30 in Sumner County, for epoxy overlay. One lane in each direction will remain open at all times.

DICKSON-WILLIAMSON COUNTY, I-40 East Construction of Truck Climbing Lane near Mile Marker 180

·        Thursday, June 21 through Wednesday, June 27 (continuous), There will be a temporary shoulder closure on I-40 East, between mile markers 180 and 183, in order to construct a new truck climbing lane.

HICKMAN COUNTY, I-40 Bridge Repair over State Route 230

·        Thursday, June 21 through Wednesday, June 27 (continuous), There will be a temporary shoulder closure on I-40 in both directions, between mile markers 151 and 153, in order to widen the bridges over SR 230.

MAURY COUNTY, New Interchange Construction at SR 166 and US 43 (SR 6/Lawrenceburg Hwy), including a concrete bulb-tee beam bridge in Mount Pleasant

·        Thursday, June 21 through Wednesday, June 27, 9AM- 3:30PM, There will be temporary lane closures and rolling roadblocks on US 43 for bridge deck welding, blasting, and striping activities.

MAURY COUNTY, SR 247 Bridge Repair over Leipers Creek

·        Thursday, June 21 through Wednesday, June 27 (continuous), SR 247 will be reduced to one lane at the bridge over Leipers Creek for bridge repair. Temporary traffic signals will control traffic.

MAURY-WILLIAMSON COUNTIES, SR 247 (Duplex Road) from US 31 to Scheduled Lane

·        Thursday, June 21 through Wednesday, June 27, 9AM-3:30PM, There will be temporary lane closures on Duplex Road, between US 31 and Scheduled Lane, for paving and widening activities.

MONTGOMERY COUNTY, SR 149 and SR 13 Grading, Drainage, and Construction of Bridge, Retaining Wall and Paving from River Road to Zinc Plant Road

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be periodic flagging operations along SR 13 and SR 149 for clearing operations.

ROBERTSON COUNTY, New Interchange Construction on I-65 at SR 109

·        Sunday, June 24 through Monday, July 1, 9AM-3PM, There will be a temporary lane closure on SR 109 for paving operations. One lane will remain open.

·        Monday, June 25 through Wednesday, June 27 (continuous), The inside lane of I-65 North will be closed, between mile markers 118 and 121, for removal of existing median wall and construction of new overhead signs. Two lanes will remain open in each direction.

RUTHERFORD COUNTY, I-24 Resurfacing from near  Rocky Fork Road to near Baker Road

·        Thursday, June 21 through Wednesday, June 27 (excluding Saturday), 8PM - 5AM, There will be temporary lane closures on I-24 in both directions, between mile markers 68 and 71, for cold planning, paving, and striping operations. One lane will remain open at all times.                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

RUTHERFORD COUNTY, SR 266 (Sam Ridley Parkway) Resurfacing from I-24 Interchange to Threet Industrial Road

·        Thursday, June 21 AND Sunday, June 24 through Wednesday, June 27, 8PM-5AM, There will be alternating lane closures on SR 266 (Sam Ridley Parkway) and US 41 (US 70/ SR1) for milling, paving, signalization, and casting adjustments. One lane will remain open in each direction.

RUTHERFORD COUNTY, I-840 Emergency Bridge Repair near Mile Marker 53 over I-24

·        Thursday, June 21 and Friday, June 22, 8PM-5AM, There will be alternating lane closures on I-840 East near mile marker 53 in order to install the metal decking onto the new bridge beams. One lane will remain open at all times. I-840 West will not be affected.

RUTHERFORD-WILSON COUNTIES, I-840 Resurfacing from East Fork Stones River Bridge in Rutherford County to North of the Wilson County Line

·        Friday, June 22 at 8PM through Monday, June 25 at 5AM, There will be lane closures on I-840, between mile markers 60 and 65, for bridge work. One lane will remain open at all times.

·        Thursday, June 21 through Wednesday, June 27 (excluding weekends), 8PM - 5AM, There will be lane closures on I-840, between mile markers 60 and 65, for paving and shoulder stone, installing traffic counters, repairing guardrail, and possible ongoing bridge work. One lane will remain open at all times.

SMITH COUNTY, I-40 Construction of Truck Climbing Lane

·        Sunday, June 24 through Wednesday, June 27, 8PM-6AM, There will be a temporary lane closure on I-40 West, between mile markers 250 and 253, for guardrail installation. One lane will remain open.

SMITH COUNTY, SR 25 Rockfall Mitigation

·        Now through August 2018, SR 25 will be reduced to one lane near mile marker 9.6 for rock buttress work. Traffic will be controlled by temporary traffic signal.   

·        Thursday, June 21 through Wednesday, June 27, 9AM-2PM, There will be a temporary road closures on SR 25 for blasting operations. This operation should take no more than 30 minutes.

SUMNER COUNY, SR 109 Retaining Wall Construction from Odom's Bend to the SR 109 Bypass of South of Gallatin

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be temporary lane closures on SR 109 in both directions for construction activities. One lane will remain open.

WILLIAMSON COUNTY, I-840 Resurfacing from west of US 31 (SR 6) to near Campbell Road

·        Thursday, June 21 through Wednesday, June 27, 8PM-5AM, There will be a lane closure on I-840 in both directions, between mile markers 27 and 32, for paving operations. There will also be temporary ramp closures depending on location of the work.

WILLIAMSON COUNTY, Intersection Safety Improvements at SR 106 (US 431/Lewisburg Pike) and Critz Lane

·        Thursday, June 21 through Wednesday, June 27 (excluding weekends), 9AM-3:30PM, There will be temporary lane closures on SR 166 for trucks hauling material on site for paving operations.

WILLIAMSON COUNTY, SR 6 (Franklin Road) Grading, Drainage, and Paving from south of Moores Lane to Concord Road

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be alternating, temporary lane closures and/or intermittent stoppages of traffic (one direction at a time) on Franklin Road, between Wikle Road and Long Road, for road work.

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be temporary lane closures on Franklin Road in both directions, between Moore’s Lane and Ashby Driver, for performing utility work and placing barrier rail. One lane will remain open in each direction.                                               

·        Thursday, June 21 through Wednesday, June 27 (continuous), There will be lane shifts at the intersection of Franklin Road and Concord Rd for utility and grading work on the east side of the intersection. All turn lanes, from Concord Road onto Franklin Road, will remain open. The dedicated northbound right turning lane, from Franklin Road onto Concord Road, will be eliminated. The new right northbound lane will be a combined through lane and right turn lane.   

WILLIAMSON COUNTY, US 31A (SR 11) Grading, Drainage, and Paving at the intersection of SR 96 (Murfreesboro Road) in Triune

·        Thursday, June 21 through Wednesday, June 27 (continuous), There will be a lane shift of traffic at the intersection of SR 11 and SR 96.

WILSON COUNTY, SR1 09 Reconstruction from North of US 70 (SR24) to South of the Cumberland River

·        Thursday, June 21 through Wednesday, June 27, 9:30AM- 3:30PM, There will be periodic flagging operations to direct traffic along SR109 in order for clearing, truck crossings, and utility work.

WILSON COUNTY, SR 141 (Hartsville Pike) Widening from South of Spring Creek to North of Lovers Lane

·        Thursday, June 21 through Wednesday, June 27, 6AM-6PM, There will be temporary lane closures on SR 141, between Spring Creek and Lovers Lane, for blasting and construction activities. One lane will remain open.

 

>>> MAINTENANCE & UTILITIES

DAVIDSON COUNTY

·        Thursday, June 21, 8PM-5AM, There will be lane closures on I-40 West, between mile markers 200 and 205, for milling and paving operations. At least one lane will remain open. Flagging will be utilized.

·        Now through June 2018, 9AM-3PM, There will be alternating lane closures on SR 100 at Pasquo Road for replacing storm drainage and installation of conduit for traffic signals, along with paving work. Traffic control will be utilized. One lane will remain open.

DICKSON COUNTY

·        Now through June 2018, SR 235 (Slayden-Marion Road) will be CLOSED at mile marker 13, between North Schmittou Street and Slayden Missionary Baptist Church in Slayden, in order to replace a box culvert.

ROBERTSON COUNTY

·        Tuesday, June 26, 7:30PM-3AM, There will be temporary lane closures on I-65, between mile markers 110 and 111, for milling and paving operations. One lane will remain open.

RUTHERFORD COUNTY

·        Tuesday, June 26 through Wednesday, June 27, 9PM-3AM, There will be alternating lane and shoulder closures on I-24 in both directions, between mile markers 66 and 67, for taking core samples of bridge deck and performing chain drag. At least one lane will remain open at all times.

SMITH COUNTY

·        Thursday, June 21 through Friday, June 22, 9AM-3PM, The Cordell Hull bridge on SR 24 in Carthage will be CLOSED for bridge inspection work. Detours and signage will be utilized for traffic diversion.

SUMNER COUNTY

·        Thursday, June 21 through Wednesday, June 27 (excluding Sunday), 12PM-3PM, There will be possible rolling roadblocks for blasting work on SR 386 (Vietnam Veterans Pkwy) at the Wynbrooke subdivision. Traffic control will be utilized.

WILLIAMSON COUNTY

·        Thursday, June 21 through Wednesday, June 27, 8PM-5AM, There will be alternating lane closures on SR 70/SR 6 (Franklin Road) in both directions for installation of a storm drain line. At least one lane will remain open.

WILSON COUNTY

·        Thursday, June 21 through Wednesday, June 27 (excluding weekend), 9AM-3PM, There will be rolling roadblocks on I-40 East, between mile markers 231 and 235, for blasting work.

·        Thursday, June 21 through Wednesday, June 27, 9AM-3PM, There will be rolling roadblocks on SR 109, between Callis Road and I-40, for rock blasting/excavation. Additionally, traffic will be reduced to one lane in both directions at the intersection of SR 109 and Callis Road for turn lane construction. Flaggers will be utilized.

·        Thursday, June 21 through Saturday, June 23, 9AM-3PM, There will be a lane and shoulder closure on SR 24 (Lebanon Road) southbound (LM 11.5) to begin turn lane construction for River Oaks Subdivision. One lane will remain open. Traffic control will be utilized.

 

Motorists are encouraged to use caution and obey reduced speed limits in all TDOT work zones, regardless of lane closure activity.  Information in this report is provided to the Department of Transportation by the contractors.  Most work is weather dependent and subject to change due to inclement weather.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel. 

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination.  Drivers should never tweet, text or talk on a cell phone while behind the wheel.

###