TDOT Specifications state: There will be no temporary state route or interstate lane closures permitted from NOON Friday, August 30 through 6:00 a.m. Tuesday, September 3, 2019 due to the Labor Day Holiday

District 47 - West TN - Northern
DYER COUNTY, SR-20 (US-412):
The resurfacing on SR 20 from US 51 (SR 3) to the Crockett County Line will cause temporary lane closures throughout the project.

GIBSON COUNTY, SR-5: The addition of turn lanes on US 45W (SR 5) between Humboldt and Trenton will cause traffic to be reduced to one lane in both directions.

GIBSON COUNTY, SR-5: The resurfacing of US 45W (SR 5) from Madison County line SR 366 and SR 366 to SR 457 will cause temporary lane closures throughout the project.

GIBSON COUNTY, SR-43: The resurfacing of US 45E (SR 43) from the Madison County line to SR 187 (Graball Dr.) will cause temporary lane closures in both directions throughout the project.

GIBSON COUNTY, SR-367: The resurfacing of SR 367 in Trenton will cause temporary lane closures throughout the project.

HENRY COUNTY, SR-54: The grading, drainage, construction of bridges, retaining wall and paving on SR 54 from near Rison Street to near Smith Road. Motorists should watch for trucks entering and exiting the roadway. *Speed limit has been reduced to 35MPH.

OBION COUNTY, Future I-69 (Phase 2): Grading, drainage, construction of eight bridges on future I-69 from south of US 51 (SR 3) to south of US 45W (SR 5) will cause possible lane closures throughout the project. *Speed limit is reduced to 45 MPH through the US 51 (SR 3) portion of the project. The southbound traffic has been switched to the northbound side on SR 3 throughout the work zone, for phase 2 construction.

Restrictions: Tuesday, November 13, 2018 SR 3 has a lane shift in the north and southbound directions. Traffic is reduced to one lane in each direction with an 11’ 6” lane restriction.

OBION COUNTY, Future I-69 (Phase 3): Grading, drainage, construction of bridges and paving on future I-69 from west of SR 21 to US 51 (SR 3) will cause possible lane closures throughout the project.

Beginning on Monday, July 29, 2019: SR 21 North will from Clifford Rives Road to Lindenwood Road. The closure is expected for approximately 1 year to allow the construction of the overhead Bridge on the new portion of SR 21 along with the Road & Drainage of the I-69 mainline. Northbound traffic will detour from SR 21 East onto Clifford Rives Road, then North on Bethlehem Road, West onto Lindenwood Road before proceeding North on SR 21. Southbound traffic will be in reverse order. Detour routes are posted.

OBION COUNTY, US 45W (US-51, SR-3): The repair of 6 bridges on various routes over US 45W US 51(SR 3). Motorist should watch trucks entering and exiting the roadway.

On Thursday, August 29, 2019 bridges on McClard Road, Mayberry Road and Wright Road will be open to traffic.

On Tuesday, September 3, 2019 Claude Tucker, Albert Owens, and N Pierce Station will be closed for bridge repair.  Bridge repairs will cause temporary lane closures daily on SR 3.  Outside lane closures on SR 3 will re-open by 6:00 p.m. daily. Temporary lane closures are possible throughout the remaining duration of the job. Construction signs are in use.

OBION COUNTY, US-51 (SR-3): The resurfacing on US 51 (SR 3) from South Main Street to north of Allie Campbell Road will cause temporary lane closures throughout the project.

WEAKLEY COUNTY, SR-22: The repair of the bridges over Mud Creek and Chestnut Branch will cause a lane closure in both directions on SR 22.

WEAKLEY COUNTY, US 45E (SR-43): The resurfacing on US 45E (SR 43) from SR 22 to the Obion County line will cause temporary lane closures throughout the project.

District 48 - West TN – Middle/Southern
CHESTER COUNTY, SR-100:
Resurfacing on SR 100 from Hardeman County line to SR 225.

Wednesday, August 28, and Thursday, August 29, 6:00 a.m.-11:00 p.m.: Intermittent right and left lane closures on SR 100 from the Hardeman County line to SR 225 east and westbound for paving operations. One lane will remain open. Weather Permitting

Friday, August 30, 6:00 a.m.–12:00 p.m.: Intermittent right and left lane closures on SR 100 from the Hardeman County line to SR 225 east and westbound for paving operations. One lane will remain open.

LOOK AHEAD
Tuesday, September 3, through Wednesday, September 4, 6:00 a.m.–11:00 p.m.:
Intermittent right and left lane closures on SR 100 from the Hardeman County line to SR 225 east and westbound for paving operations. One lane will remain open.

HARDEMAN COUNTY, SR-18: The resurfacing on SR 18 from US 64 (SR 15) to the Madison County line may cause temporary lane closures. Motorist should watch for crews and equipment in the roadways.

HARDEMAN COUNTY, SR-57: The resurfacing on SR 57 from Saulsbury Rd. to Old Rogers Spring Rd. may cause temporary lane closures. Motorist should watch for crews and equipment in the roadways.

HARDIN COUNTY, SR-128:  The grading, drainage, and paving on SR 128 from south of One Stop Drive to south of Opel Loop. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

HAYWOOD COUNTY, SR-1 (US 70): The resurfacing on SR 1(US 70) from the Tipton County line

to Big Muddy Creek may cause temporary lane closures. Motorist should watch for crews and equipment in the roadways. Motorist should watch for crews and equipment in the roadways.

HAYWOOD COUNTY, SR-19 (Brownsville Bypass): The construction of an I-Beam bridge along with grading, drainage, and paving may cause temporary lane closures on SR 19 (Brownsville Bypass) from east of SR 87 to west of Windrow Rd. One lane will remain open at all times. Motorists should watch for trucks entering and exiting the roadway. Speed limit is reduced to 45 MPH within the project limits.

HENDERSON COUNTY, SR-201: The resurfacing on SR 201 from Chester County line to the SR 104 may cause temporary lane closures. Motorist should watch for crews and equipment in the roadways.

Wednesday, August 21 through Wednesday, September 25, 2019 6:00 a.m.–11:00 p.m.: The resurfacing on SR 201 from the Chester County line to SR 104 will cause temporary lane closures. Weather Permitting

MADISON COUNTY, SR-186 (US 45 Bypass) and I-40: Interchange improvements on SR 186 (US 45) north and southbound from the I-40 ramps to Old Hickory Blvd for paving and construction of retaining walls.  Widening of I-40 from just east of Exit 79 to just east of Exit 82.

Monday, August 26, through Thursday, August 29, EACH DAY from 9:00 a.m. – 3:00 p.m.

Highland Avenue will have intermittent left and right lane closures both north and south bound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities. WEATHER PERMITTING

Tuesday, September 3 through Wednesday, September 4, EACH DAY from 9:00 a.m. – 3:00 p.m.

Highland Avenue will have intermittent left and right lane closures both north and south bound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities. WEATHER PERMITTING

LOOK AHEAD
Thursday, September 5 and Friday, September 6, EACH DAY from 9:00 a.m. – 3:00 p.m.:

SR-5 (Highland Avenue will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities. WEATHER PERMITTING

Saturday, September 7 from 6:00 a.m. – 6:00 p.m.: SR-5 (Highland Avenue will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities.  WEATHER PERMITTING

Monday, September 9 through Wednesday, September 11, EACH DAY from 9:00 a.m. – 3:00 p.m.: SR-5 (Highland Avenue will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for bridge construction activities. WEATHER PERMITTING

MADISON COUNTY, SR-5: Resurfacing on SR 5 north and southbound right and left lanes from SR 186 (Highland) to SR 43 (Three-Way).

Wednesday, August 28 and Thursday, August 29, 6:00 a.m.-11:00 p.m.: Intermittent right and left lane closures on SR 5 from SR 186 to SR 43 north and southbound for paving operations. One lane will remain open. (Work will not begin in the southbound direction before 8:30 a.m.)

WEATHER PERMITTING
Friday, August 30, 6:00 a.m.–12:00 p.m.:
Intermittent right and left lane closures on SR 5 from

SR 186 to SR 43 north and southbound for paving operations. One lane will remain open. (Work will not begin in the southbound direction before 8:30 a.m.) WEATHER PERMITTING

LOOK AHEAD
Tuesday, September 3 and Wednesday, September 4, 6:00 a.m.–11:00 p.m.:
Intermittent right and left lane closures on SR 5 from SR 186 to SR 43 north and southbound for paving operations. One lane will remain open. (Work will not begin in the southbound direction before 8:30 a.m.) WEATHER PERMITTING

MADISON COUNTY, SR-198:  The construction of a concrete box bridge on SR 198 over Bear Creek (LM 8.65) along with grading, drainage, and paving will cause temporary lane closures.

Restrictions: Beginning April 29, 2019 there will be an 11’ width restriction and a temporary signal will be put in place. Motorists should watch for crews and equipment in the roadways.
WEATHER PERMITTING

MADISON COUNTY, SR-223:  The grading, drainage, and paving on SR 223 from North of James Lawrence Rd to I-40, including Technology Center Drive. Motorists should watch for trucks entering and exiting the roadway from the construction zones and also crossing the roadways.

LOOK AHEAD
Friday, September 6, 8:00 p.m. through Monday, September 9, 6:00 a.m.:
There will be intermittent right lane closures on I-40 westbound at Exit 76 as well as intermittent closures of on and off ramps at Exit 76 for deck overlay. There will be intermittent lane closures on SR 223 north or southbound for resurfacing and bridge deck repair. WEATHER PERMITTING

TDOT Region 4 On-Call Guardrail Repair:
Wednesday, August 28 and Thursday, August 29, 8:00 p.m.-6:00 a.m.: 
There will be night time lane closures at the following various locations to repair damaged guardrail. THP will assist with traffic control. Weather Permitting.

·       I-40, Madison, Henderson and Decatur counties east and westbound (MM 67 to MM 126)

District 49 - West TN – Southwest
FAYETTE COUNTY, SR-18:
Miscellaneous safety improvements on SR 18 at the intersection of SR 57 may cause temporary lane closures throughout the project.

SHELBY COUNTY, I-40: Resurfacing on I-40 from the Hernando Desoto Bridge to near the Wolf River Bridge (Chelsea Avenue)

Wednesday, August 28, Thursday, August 29, and Tuesday, September 3, 8:00 p.m.-6:00 a.m.: There will be INTERMITTENT closures, with one lane to remain open, on I-40 east and westbound to allow for resurfacing and safety improvements. Detours will be provided as needed. Weather Permitting.

Wednesday, August 28 and Thursday, August 29, 12:00 a.m.-5:00 a.m.: The ramp from I-240 northbound to I-40 westbound will be closed. Detours will be provided

LOOK AHEAD
Wednesday, September 4 and Thursday, September 5, 12:00 a.m.-5:00 a.m.:
Close I-40 westbound at the I-240 southbound split to I-40 westbound at the I-240 northbound ramp. Detours will be provided at Lamar Ave.

Friday, September 6, 8:00 p.m. through Monday, September 9, 6:00 a.m.: The ramp from I-40 eastbound to Chelsea Avenue (Exit 2) and the ramp from I-40 westbound to Smith Avenue (Exit 2) will be closed for concrete repairs. Detours will be provided.

SHELBY COUNTY, I-55: Resurfacing on I-55 from the Mississippi State line to Millbranch Road including bridge deck repair.

Wednesday, August 28, Thursday, August 29, and Tuesday, September 3, 8:00 p.m.-6:00 a.m.: INTERMITTENT lane and ramp closures on I-55 north and southbound from Millbranch Road to Mississippi state-line to perform the resurfacing work. Detours will be provided.

SHELBY COUNTY, SR-4: Repair of the Bridge on US-78 (SR-4) over Johns Creek (LM-2.23) 600 feet north of Shelby Drive
Tuesday, September 3, 7:00 p.m.-6:00 a.m.: There will be INTERMITTENT closures with one lane to remain open on SR 4 (Lamar Avenue) north and southbound from Mississippi Stateline (0.00) to Shelby Drive for bridge repairs. Weather Permitting. 

SHELBY COUNTY, SR-4: Grading, Drainage, Construction of a Concrete Bulb-Tee bridge, Retaining Walls and paving on US-78 (SR 4) from the Mississippi State Line to south of Shelby Drive (SR 175)

Tuesday, September 3 through Thursday, September 5, 7:00 p.m.-6:00 a.m.: There will be INTERMITTENT lane closures north and southbound on SR-4 (Lamar Ave.) beginning at the state line, for the purpose of relocating barrier rail.

SHELBY COUNTY, SR-14: The grading, drainage, construction of concrete Bulb-Tee and I-beam bridges, signals and paving on SR 14 from east of Old Covington Pike to SR 385 will cause possible lane closures throughout the project. *Speed limit has been reduced to 45 MPH.

 

SHELBY COUNTY, SR-14: Construction on SR 14 for a widening project from SR 385 to east of Kerrville Rosemark. There will be possible temporary lane closures throughout the project. *Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-14:  Bridge repair at Raleigh-Millington Exi
tWednesday, August 28, 12:00 a.m. through Sunday, September 15: The Raleigh-Millington Exit from northbound SR 14 to Raleigh-Millington will be closed for repairs.

Shelby County, SR-175: Resurfacing on SR 175 from Houston Levee Road to Byhalia Road will cause temporary lane closures throughout the project.

SHELBY COUNTY, SR-385: Resurfacing on SR 385 from the Hacks Cross Road to Byhalia Road

Wednesday, August 28, Thursday, August 29, and Tuesday, September 3, 8:00 p.m.-6:00 a.m.: INTERMITTENT lane closures on SR 385 east and westbound from Hacks Cross Road to Byhalia Road to perform the resurfacing work. Detours will be provided. Weather Permitting.

SHELBY COUNTY, SR-385: Resurfacing on SR 385 from Memphis-Arlington Road to Brunswick Road will cause temporary lane closures throughout the project.

TDOT District 49 On-Call Guardrail/Concrete Barrier Rail Repair:

Wednesday, August 28, 8:00 p.m.-6:00 a.m.: There will be night time ramp closures from I-240 westbound to I-55 southbound (Exit 25A) and from I-240 eastbound to eastbound Poplar Avenue (Exit 15A) for emergency repairs. Weather Permitting. If weather prohibits, the closures will be on the next available night.

Wednesday, August 28, Thursday, August 29, and Tuesday, September 3, 8:00 p.m.–6:00 a.m.:  There will be night time lane closures on SR 3 (Shelby and Tipton Counties), SR 14 (Shelby County), SR 385 (Shelby County), SR 204 (Shelby County), I-40 (Fayette and Shelby Counties), I 269 (Shelby and Fayette Counties), I 55 and I 240 (Shelby County): One lane will be CLOSED to repair damaged guardrail. THP will assist with traffic control. Weather Permitting

Thursday, August 29, Tuesday, September 3, and Wednesday, September 4, 9:00 a.m.-3:00 p.m.:  There will be day time lane closures at various locations on SR 1 and SR 57 (Fayette County), to repair damaged guardrail. One lane will be CLOSED to repair damaged guardrail. If weather prohibits, the repairs will be performed on the next available day. Flagmen will be used where necessary. Weather Permitting

Friday, August 30, 9:00 a.m.-12:00 p.m.:  There will be day time lane closures at various locations on SR 1 and SR 57 (Fayette County), to repair damaged guardrail. One lane will be CLOSED to repair damaged guardrail. If weather prohibits, the repairs will be performed on the next available day. Flagmen will be used where necessary. Weather Permitting

Shelby County, Park Ave: Replacement of curb and gutter on Park Ave from Lynnfield Rd going west approximately 1500’ will cause temporary lane closures. Expected completion date 8/30/2019.

TDOT District 49 MAINTENANCE:

Thursday, August 29, Tuesday, September 3, Wednesday, September 4, 9:00 a.m.-3:00 p.m., and Friday, August 30, 9:00 a.m.-12:00 p.m.: There will be possible lane closures on all interstates and state routes in District 49 for routine maintenance activities on an as needed basis.

NON TDOT
Arkansas Department of Transportation

Crittenden County – A routine bridge inspection requires temporary lane closures on the I-40 Mississippi River Bridge, according to Arkansas Department of Transportation (ARDOT) officials.

Weather permitting, Wednesday, September 4 and Thursday, September 5 the outside westbound lane will be closed from 7:00 a.m.-3:00 p.m. Additionally an outside lane closure, starting on the westbound and moving to the eastbound side, will be required

Monday, September 9 through Thursday, September 12. A westbound lane closure may be in place between 7:00 a.m.-3:00 p.m. or an eastbound lane closure may be in place from 9:00 a.m.-5:00 p.m..

Traffic will be controlled by signage and traffic barrels. Drivers should exercise caution when approaching and traveling through all highway work zones.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or for West Tennessee follow https://twitter.com/NicLawrenceTDOT.

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don’t want to lose another member of our TDOT family. We’re asking you to WORK WITH US. Click on the WORK WITH US logo to learn more.

Work_with_Us_with_slogan-web-thumb (1)1