DYER COUNTY, SR-3 (US-51):  The repair of bridges on US 51 (SR 3) over SR 211 in Dyersburg will cause temporary lane closures throughout the project. *Speed limit has been reduced to 55 MPH.

DYER COUNTY, SR-3 (US-51):  The repair of bridges on US 51 (SR 3) over the South Fork Forked Deer River will cause temporary lane closures throughout the project. *Speed limit has been reduced to 55/45 MPH.

Restrictions: Beginning January 25, 2021, Traffic will be reduced to one lane in each direction with a 12’ 6” lane restriction.

DYER COUNTY, SR-20: The repair of bridge on US 412 (SR 20) over Hogwallow Road will cause temporary lane closures throughout the project. *Speed limit has been reduced to 55 MPH.

HENDERSON COUNTY (New Lexington By-Pass): The grading, drainage, construction of bridges and retaining walls, signals and paving on US 412 (SR 459) from US 412 (SR 20) west of Lexington to near SR 22 south of Lexington. Motorists should watch for trucks entering and exiting the roadway.

HENRY COUNTY, SR-54: The grading, drainage, construction of bridges, retaining wall and paving on SR 54 from near Rison Street to near Smith Road. Motorists should watch for trucks entering and exiting the roadway. *Speed limit has been reduced to 35 MPH.

OBION COUNTY, Future I-69 (Phase 3): Grading, drainage, construction of bridges and paving on future I-69 from west of SR 21 to US 51 (SR 3) will cause possible lane closures throughout the project.

Tuesday, October 13, 2020: Bethlehem Road north from Clifford Rives Road to Lindenwood Road will be closed. Claude Tucker Road north from Cloys Road to Section Line Road will be closed. Detour routes are posted.

WEAKLEY COUNTY, US 45E (SR-43): The repair of bridge on US 45E (SR 43) over the North Fork Obion River and Overflow will cause possible temporary lane closures throughout the project.

TDOT District 47 MAINTENANCE:

Wednesday, February 10 through Wednesday, February 17, 9:00 a.m.-3:00 p.m.: There will be possible lane closures at various locations in Region IV in order to repair pavement on an as needed basis.

District 48 - West TN – Middle/Southern

CROCKETT COUNTY, SR-20 (US 412) (Non-TDOT work):

Wednesday, February 10 through Wednesday, February 17, 7:00 a.m.-5:00 p.m.: There will be possible lane closures on SR 20 (US 412) east and westbound in Bells, TN at SR 88, for the installation of a turning lane in the median and shoulder upgrades.

HARDIN COUNTY, SR-69: The construction of a Bulb Tee bridge over Doe Creek along with grading, drainage, and paving may cause temporary lane closures on SR 69 at LM 10.06. Motorists should watch for trucks entering and exiting the roadway.

HARDIN COUNTY, SR-128: The grading, drainage and paving on SR 128 from south of Pyburns Drive (LM 3.11) to north of SR 226 (Airport Road) (LM 6.54). Motorists should watch for trucks entering and exiting the roadway.

HAYWOOD COUNTY, SR-1 (US 70): Miscellaneous safety improvements on SR 1 from near Briley/Chestnut Grove Road to the Madison County line may cause temporary lane closures.

HAYWOOD COUNTY, SR-19 (Brownsville Bypass): The construction of an I-Beam bridge along with grading, drainage, and paving may cause temporary lane closures on SR 19 (Brownsville Bypass) from east of SR 87 to west of Windrow Rd. One lane will remain. Motorists should watch for trucks entering and exiting the roadway. Speed limit is reduced to 45 MPH within the project limits. Shaw Chapel and King Road are closed at SR 19 and a detour put in place. Haralson St (Old SR19) will be closed at SR19 Bypass beginning Wednesday 11-4-2020 and a detour put in place.

HENDERSON COUNTY, SR 22:  The repair of the bridges on SR 22 over Big Beaver Creek (LM 19.51) and Little Beaver Creek (LM 20.01). Restrictions: Beginning February 1, 2020 there will be a 12’ width restriction put in place. Motorists should watch for crews and equipment in the roadways. One lane will remain open in both directions.

MADISON COUNTY, I-40: The widening of I-40 east of US 45 (SR 5) MM 82.0 to east of US 70

(SR 1) MM 87.0 in Jackson, including bridges, retaining walls and installation of TDOT Smartway Intelligent Transportation System.

Wednesday, February 10 through Wednesday, February 17, 7:00 a.m.-6:00 p.m.: Campbell St. will be down to one lane in each direction over I-40 for Phase 1 bridge construction activities.

Wednesday, February 10 through Friday February 12, 7:00 p.m.-6:00 a.m.: I-40 east and westbound will have intermittent right lane closures from Exit 82 to Exit 87 for removal of light poles.

Monday, February 15 through Wednesday, February 17, 7:00 p.m.-6:00 a.m.:  I-40 east and westbound will have intermittent right lane closures from Exit 82 to Exit 87 for removal of light poles.

Closed until Summer of 2021: Old Henderson Rd. Bridge over I-40 will be closed to thru traffic for Phase 1 bridge demolition activities. Detours will be posted for traffic.

Closed until Summer of 2021: Watson Rd. Bridge over I-40 will be closed to thru traffic for Phase 1 bridge demolition activities. Detours will be posted for traffic.

LOOK AHEAD

Wednesday, February 17 through Wednesday, February 24, 7:00 a.m.-6:00 p.m.: Campbell St. will be down to one lane in each direction over I-40 for Phase 1 bridge construction activities.

Thursday, February 18 and Friday, February 19, 7:00 p.m.-6:00 a.m.: I-40 east and westbound will have intermittent right lane closures from Exit 82 to Exit 87 for removal of light poles.

MADISON COUNTY, SR-186 (US 45 Bypass) and I-40: Interchange improvements on SR 186 (US 45) north and southbound from the I-40 ramps to Old Hickory Blvd for paving and construction of retaining walls. Widening of I-40 from just east of Exit 79 to just east of Exit 82.

Thursday, February 11 and Friday, February 12, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for signal installation activities.

Monday, February 15 through Wednesday, February 17, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for signal installation activities.

Monday, February 15 through Wednesday, February 17, 8:00 p.m.–6:00 a.m.: I-40 east and westbound will have intermittent left and right lane closures from mile marker 79 to mile marker 82 for overhead sign installation.

LOOK AHEAD

Thursday, February 18 and Friday, February 19, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for signal installation activities.

Monday, February 22 through Wednesday, February 24, 9:00 a.m.–3:00 p.m.: SR 5 (Highland Avenue) will have intermittent left and right lane closures both north and southbound from Vann Drive to the Carriage House/Ridgecrest intersection for signal installation activities.

TDOT District 48 MAINTENANCE:

Wednesday, February 10 through Wednesday, February 17, 9:00 a.m.-3:00 p.m.: There will be possible lane closures at various locations in Region IV in order to repair pavement on an as needed basis.

District 49 - West TN – Southwest

FAYETTE COUNTY, SR-196: The repair of bridge over Shaw Creek will cause a lane closure with temporary traffic signal near MM 7.0.

SHELBY COUNTY, I-40 & I-240: ITS Preventative Maintenance Contract lane and ramp closures to install overhead signs.

Friday, February 12, 8:00 p.m.-6:00 a.m.: There will be nighttime ramp closures in Shelby County to install overhead signs at the I-240 northbound EXIT 31 to I-40 westbound and the I-240 northbound EXIT 31 “On” ramp from Madison Ave to I-40 westbound. Traffic will be detoured via Exit 2 to Chelsea Ave during operation. Weather Permitting.

Friday, February 12, 8:00 p.m.-6:00 a.m.: There will be intermittent lane closures on I-40 east and westbound between MM 1.0 and MM 2.0 for installing overhead signs. Traffic will be reduced to one lane westbound. Weather Permitting.

SHELBY COUNTY, SR-14: The grading, drainage, construction of concrete Bulb-Tee and I-beam bridges, signals and paving on SR 14 from east of Old Covington Pike to SR 385 will cause possible lane closures throughout the project. *Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-14: Construction on SR 14 for a widening project from SR 385 to east of Kerrville Rosemark Rd. There will be possible temporary lane closures throughout the project. Access to SR 14 from McCalla Rd West will be permanently detoured to Donnell Rd. *Speed limit has been reduced to 45 MPH.

SHELBY COUNTY, SR-205: The addition of turn lanes on SR 205 (Airline Rd) from Brooks River Drive to south of I 40 will have lane closures throughout the project.

Wednesday, February 10 through Tuesday, February 16, 9:00 a.m.-3:00 p.m.: There will be intermittent lane closures on SR 205 north and southbound from Brooks River Drive (LM 15.75) to just south of I-40 (LM 16.07) to perform temporary road widening work. There will be one lane traffic with flaggers present at times. *Speed limit has been reduced to 35 MPH. Weather Permitting.

TIPTON COUNTY, SR-59: The Emergency Slide Repair of SR 59 near MM 1.0 will cause a road closure with full detour signed.

TDOT District 49 On-Call Guardrail/Concrete Barrier Rail Repair
Thursday, February 11 through Wednesday, February 17, 9:00 a.m.-12:00 p.m.:
There will be daytime lane closures at various locations on SR 195, MM 3.0-MM 3.4 (Fayette County) and SR 206, MM 2.3 (Tipton County.) One lane will be closed. Flagmen will be used to direct traffic. Weather Permitting.

Wednesday, February 10 through Tuesday, February 16, 8:00 p.m.-6:00 a.m.: There will be night time lane closures at various locations on SR 3 (Shelby County), SR 385 (Shelby County), SR 14 (Shelby County), SR 15 (Shelby County), I-40 (Fayette and Shelby Counties), I-269 (Shelby and Fayette Counties), I-55 and I-240. One lane will be CLOSED to repair damaged guardrail. THP will assist with traffic control. Weather Permitting.

Wednesday, February 10 through Tuesday, February 16, 8:00 p.m.-6:00 a.m.: There will be nighttime ramp closures in Shelby County at the I-55 southbound EXIT 6B to I-240 northbound,

I-240 westbound EXIT 25A to I-55 southbound, and the SR 385 westbound “On” ramp from Hacks Cross. Weather Permitting.

LOOK AHEAD:

Wednesday, February 17 through Tuesday, February 23, 8:00 p.m.-6:00 a.m.: There will be nighttime ramp closures in Shelby County at the I-55 southbound EXIT 6B to I-240 northbound, I-55 northbound EXIT 12C ‘on’ ramp from Metal Museum Drive,I-240 westbound EXIT 25A to I-55 southbound, and the SR 385 westbound “On” ramp from Hacks Cross and intermittent all lane closures at I-55 northbound ramp to I-55 northbound at the I-55/I-240 junction. Weather Permitting.

TDOT District 49 MAINTENANCE
Thursday, February 11 through Wednesday, February 17, 9:00 a.m.-3:00 p.m.:
There will be possible lane closures on all interstates and state routes in District 49 for routine maintenance activities on an as needed basis.

From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from any land-line or cellular phone for travel information, or follow us on Twitter at www.twitter.com/TN511 for statewide travel or for West Tennessee follow https://twitter.com/NicLawrenceTDOT.

As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel.

In 2016, the Tennessee Department of Transportation lost three workers in the line of duty. All three were struck by passing motorists. Those tragedies bring the total number of TDOT lives lost to 112. We don’t want to lose another member of our TDOT family. We’re asking you to WORK WITH US. Click on the WORK WITH US logo to learn more.

Work_With_Us-Web_Banner