EC-STR-19

CATCH BASIN PROTECTION
EC-STR-19

(Click image to open PDF)

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
EC-STR-2 SEDIMENT FILTER BAGS POSSIBLE USE OF SEDIMENT FILTER BAG
EC-STR-3C SILT FENCE WITH WIRE BACKING SEE STANDARD DRAWING FOR INSTALLATION DETAILS
EC-STR-3E SILT FENCE FABRIC JOINING DETAILS SEE STANDARD DRAWING FOR INSTALLATION DETAILS

Related Item Numbers

ITEM NO. U/M DESCRIPTION REMARKS
209-05 C.Y. SEDIMENT REMOVAL  
209-40.30 EACH CATCH BASIN PROTECTION (TYPE A)  
209-40.31 EACH CATCH BASIN PROTECTION (TYPE B)  
209-40.32 EACH CATCH BASIN PROTECTION (TYPE C)  
209-40.33 EACH CATCH BASIN PROTECTION (TYPE D)  
209-40.34 EACH CATCH BASIN PROTECTION (TYPE E)  

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 03-15-2004 | 04-15-2006 | 04-01-2008
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: January 17, 2019 at 10:21 AM