Public Hearing for ARAP Permits for Upper Duck River

NRS19.148, NRS21.274, NRS22.201, NRS22.288, NRS22.320, NRS23.098
October 30, 2023, from 5:00 pm to TBD CST

Event

October 30, 2023

5:00 pm to TBD CST


Location

In-Person: Henry Horton State Park Conference Hall 4209 Nashville Hwy Chapel Hill, TN 37034 Virtual:


Contact

robert.d.baker@tn.gov


Public Hearing Notice

This notice includes six separate applications for water withdrawals in the Upper Duck River basin. Each application will be reviewed independently, and comments can be directed to either a single application or collectively.

NRS19.148 - Lewisburg Water & Wastewater proposes the continued withdrawal of up to 4.57 million gallons per day from the Duck River in Marshall County for public water supply.

NRS21.274 - Shelbyville Power, Water, and Sewerage Systems proposes the continued withdrawal of up to 8.35 million gallons of water per day from the Duck River in Shelbyville for public water supply.

NRS22.201 - The Duck River Utility Commission proposes the continued withdrawal of up to 12.32 million gallons per day from Normandy Reservoir for public water supply.

NRS22.288 - The City of Springhill proposes the continued withdrawal of up to 6.00 million gallons per day from the Duck River in Marshall County for public water supply.

NRS22.320 - Bedford County Utility District proposes the continued withdrawal of up to 4.07 million gallons of water per day from the Duck River in Bedford County for public water supply.

NRS23.098 - Maury County Water Systems proposes construction of a raw water intake in the Duck River near Columbia and withdrawal of up to 3.00 million gallons of water per day from the Duck River for public water supply.