EC-STR-13

ROCK AND EARTH SEDIMENT EMBANKMENT
EC-STR-13

(Click image to open PDF)

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
EC-STR-1 DEWATERING STRUCTURE ROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A DEWATERING STRUCTURE.
EC-STR-2 SEDIMENT FILTER BAGS ROCK SEDIMENT DAM IMPOUNDMENTS SHOULD BE DEWATERED WITH A SEDIMENT FILTER BAG.
     

Related Item Numbers

ITEM NO. U/M DESCRIPTION REMARKS
203-01 C.Y. ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)  
209-05 C.Y. SEDIMENT REMOVAL  
709-05.06 TON MACHINED RIP-RAP (CLASS A-1)  
740-10.03 S.Y. GEOTEXTILE (TYPE III)(EROSION CONTROL)  
801-01.07 UNIT TEMPORARY SEEDING (WITH MULCH)  

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
10-26-1992 | 12-18-1995 | 05-27-2001 | 12-18-2002 | 01-22-2003 | 04-15-2006 | 04-01-2008 | 08-01-2012
If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: May 13, 2024 at 9:37 AM