D-FLU-2

BRIDGE END DRAIN FLUME DETAILS
D-FLU-2

(Click image to open PDF)

Latest Revision Note

XX/XX/20XX    NEW STANDARD DRAWING

Related Standard Drawings

DRAWING DESCRIPTION REMARKS
D-CB-10S STANDARD RECTANGULAR CONCRETE NO. 10 CATCH BASIN FOR ADDITIONAL CONSTRUCTION NOTES AND DETAILS
D-CB-DI ALTERNATE CATCH BASIN DROP INLET DETAILS FOR ADDITIONAL CONSTRUCTION NOTES AND DETAILS
D-FLU-2A BRIDGE END DRAIN FLUME DETAILS FOR BRIDGE END DRAIN ALTERNATIVE DESIGN
D-PB-1 STANDARD DETAILS FOR CONCRETE PIPE INSTALLATION FOR PIPE INSTALLATION STANDARD DETAILS
D-PB-2 STANDARD DETAILS FOR FLEXIBLE PIPE INSTALLATION FOR PIPE INSTALLATION STANDARD DETAILS
D-PE SERIES Pipe Culverts and Endwalls → SAFETY CROSS DRAIN ENDWALLS FOR TYPE "U" CROSS DRAIN ENDWALL OR PROTECTED ENDWALL
RP-VC-10 VERTICAL CONCRETE CURBS AND CURB AND GUTTER (FOR 8" TO 12" GUTTER DEPTH) FOR CURB AND CURB AND GUTTER DETAILS
S-GR31 SERIES Safety Design and Guardrails → GUARDRAIL DETAILS FOR POSTS, RAIL, AND HARDWARE STANDARDS FOR CONSTRUCTION
S-GRC SERIES Safety Design and Guardrails → GUARDRAIL CONNECTIONS FOR CONNECTING TO BRIDGE RAIL OR OTHER CONCRETE BARRIER FOR DETAILS
     

Related Item Numbers

ITEM NO. U/M DESCRIPTION
     
     
     
     
     
     
     

Archived Standard Drawings

DATES OF EACH ARCHIVED DRAWINGS ( THE INITIAL STANDARD DRAWING IS BOLD )
07-07-2023  

If you find any mistakes, missing information or have a question, contact:
TDOT CADD Support
1200 James K. Polk Building
Nashville, TN 37243-1402
TDOT.CADDSupport@tn.gov

This Page Last Updated: May 13, 2024 at 9:37 AM